flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

12-story mixed-use development opens in Washington, D.C.

Mixed-Use

12-story mixed-use development opens in Washington, D.C.

Cooper Carry designed the project.


By David Malone, Associate Editor | June 3, 2019
Columbia Place building in Washington, D.C. at night

All photos courtesy Cooper Carry

Columbia Place, a 12-story mixed-use development in Washington, D.C. features hospitality, residential, and retail offerings in the Shaw Historic District. The recently completed adaptive reuse project incorporates eight historic buildings, one of which is a Civil War-era home, into the design.

The $230 million, Cooper Carry-designed project includes a dual-branded, 4-star hotel with two levels of underground parking and more than 200 apartments. The hotel component comprises a 357-room Courtyard by Marriott hotel and a 147-room Residence Inn. The apartment component, dubbed The Lurgan, includes 203 units available in studio, one-, and two-bedroom layouts. Additionally, the development includes 3,000 sf of ground-floor retail, 4,000 sf of rooftop amenities, and 10,000 sf of shared meeting space.

 

See Also: Grilled to order: The art of outdoor kitchens

 

The Civil War-era home, a three-story townhome, was moved from its original location and incorporated into the project within the dual-bran hotel. The existing Lurgan building, as well as seven other historic buildings, were restored and reused for street-level retail to enhance the residential experience and preserve the area’s historic character.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

Tags

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021