flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

12-story mixed-use development opens in Washington, D.C.

Mixed-Use

12-story mixed-use development opens in Washington, D.C.

Cooper Carry designed the project.


By David Malone, Associate Editor | June 3, 2019
Columbia Place building in Washington, D.C. at night

All photos courtesy Cooper Carry

Columbia Place, a 12-story mixed-use development in Washington, D.C. features hospitality, residential, and retail offerings in the Shaw Historic District. The recently completed adaptive reuse project incorporates eight historic buildings, one of which is a Civil War-era home, into the design.

The $230 million, Cooper Carry-designed project includes a dual-branded, 4-star hotel with two levels of underground parking and more than 200 apartments. The hotel component comprises a 357-room Courtyard by Marriott hotel and a 147-room Residence Inn. The apartment component, dubbed The Lurgan, includes 203 units available in studio, one-, and two-bedroom layouts. Additionally, the development includes 3,000 sf of ground-floor retail, 4,000 sf of rooftop amenities, and 10,000 sf of shared meeting space.

 

See Also: Grilled to order: The art of outdoor kitchens

 

The Civil War-era home, a three-story townhome, was moved from its original location and incorporated into the project within the dual-bran hotel. The existing Lurgan building, as well as seven other historic buildings, were restored and reused for street-level retail to enhance the residential experience and preserve the area’s historic character.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

Tags

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â