A new 158-unit, 114,878-sf multifamily development is set to begin construction in Washington, D.C.’s Logan Circle submarket.
The five-story project is located at the intersection of 15th Street NW and S Street NW, less than a half mile from the U Street Metro Station. The project is also only one block away from 14th Street NW, the heart of nightlife, restaurants, and entertainment for the area’s young professionals.
The project will sit on a 44,595-sf parcel of land that is currently a parking lot for The House of the Temple. The land includes a historic carriage house. Key elements of the new complex include a fitness facility, a business center, an entertainment space with hosting capabilities, a rooftop recreation areas with grilling stations and a pool, a 10,000-sf backyard garden, an 108 below-grade parking spaces.
Hickok Cole is the project architect and Harvey-Cleary Builders is the general contractor. The project developer is Perseus TDC. The project is slated for completion in spring 2023.
Related Stories
| Jan 19, 2020
Pioneer introduces new Lux-Flow showerhead
Pioneer Industries has launched the Pioneer Lux-Flow showerhead.
| Dec 18, 2019
Making contacts that lead to "true partnerships" is key to Student Housing ProCONNECT event for Pfister's Tracey Qualteri
Tracey Qualteri, Pfister Faucets, at Student Housing ProConnect in Denver, November 11 2019
Multifamily Housing | Dec 11, 2019
8 noteworthy multifamily projects to open in late 2019
From a prefab high-rise in Denver to a seaside village in Oxnard, Calif., these projects highlight the innovative multifamily developments to open their doors in late 2019.
Multifamily Housing | Dec 9, 2019
Student Housing ProCONNECT event draws developers, contractors, architects, and building product manufacturers to Denver
2½-day event connects attendees with vendors—and each other.