A new 158-unit, 114,878-sf multifamily development is set to begin construction in Washington, D.C.’s Logan Circle submarket.
The five-story project is located at the intersection of 15th Street NW and S Street NW, less than a half mile from the U Street Metro Station. The project is also only one block away from 14th Street NW, the heart of nightlife, restaurants, and entertainment for the area’s young professionals.
The project will sit on a 44,595-sf parcel of land that is currently a parking lot for The House of the Temple. The land includes a historic carriage house. Key elements of the new complex include a fitness facility, a business center, an entertainment space with hosting capabilities, a rooftop recreation areas with grilling stations and a pool, a 10,000-sf backyard garden, an 108 below-grade parking spaces.
Hickok Cole is the project architect and Harvey-Cleary Builders is the general contractor. The project developer is Perseus TDC. The project is slated for completion in spring 2023.
Related Stories
| Jul 20, 2012
2012 Giants 300 Special Report
Ranking the leading firms in Architecture, Engineering, and Construction.
| Jul 19, 2012
Rental market pushing service, ‘community’
The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
Oakdale, Calif., Heritage Oaks Senior Apartments opens
New complex highlights senior preferences for amenities.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 2, 2012
Building Team completes two additions at UCLA
New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.