How we get the data
Data for our Giants 300 charts is based on information supplied by the respective firms. This year, we asked firms to verify the accuracy of their data.
Also new this year: separate charts for the top Architecture and Engineering firms, rather than lumping them together as “design firms.”
The Contractors chart (page 34) lists firms by their revenue for general contracting, design-build, CM at risk, and IPD—projects where all revenues flow through the contractor.
The CM Agent and PM chart (page 36) lists firms that derive their revenues through fees.
Please note: In subsequent charts for BIM, Government, Multifamily, etc., only data for Contractors (GC/DB/CM at risk/IPD) is presented in the issue.
Rankings of the leading CM Agent and PM firms in these categories can be found on our website, with other more detailed charts avaiable below.
And please print out our detailed Giants 300 Index at: www.BDCnetwork.com/giants300/2012/index. See how your firm ranks against the competition. +
Giants 300 Special Report
Related Stories
| May 25, 2011
Low Impact Development: Managing Stormwater Runoff
Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.
| May 25, 2011
Register today for BD+C’s June 8th webinar on restoration and reconstruction projects
Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.
| May 25, 2011
Hotel offers water beds on a grand scale
A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.
| May 25, 2011
Smithsonian building $45 million green lab
Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.
| May 25, 2011
World’s tallest building now available in smaller size
Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.