flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2019 sets new record for supertall building completion

Market Data

2019 sets new record for supertall building completion

Overall, the number of completed buildings of at least 200 meters in 2019 declined by 13.7%.


By CTBUH | December 12, 2019

Courtesy Pixabay

The Council on Tall Buildings and Urban Habitat (CTBUH) has released its annual report, CTBUH Year in Review: Tall Trends of 2019, part of the Tall Buildings in Numbers data analysis series. The report shows that 126 buildings of 200 meters’ height or greater were completed in 2019, including 26 “supertall” buildings of at least 300 meters’ height, a new record.

The total number of supertall buildings worldwide is now 170. In 2013, there were 76 buildings 300 meters or higher worldwide; in 2000, only 26. The 530-meter Tianjin CTF Finance Centre in Tianjin, China was the tallest building completed in 2019.

“This is the fifth year in a row that a building over 500 meters has been completed, which is a remarkable accomplishment for the building industry – it was only 15 years ago that such buildings didn’t exist,” said CTBUH Chief Executive Officer Antony Wood.

Overall, the number of completed buildings of at least 200 meters in 2019 declined by 13.7% (there were 146 in 2018). This is the first year in which the overall completion figure declined since the 2010 to 2011 gap, which was attributed to the lag effect of project cancellations due to the 2008 recession. Due to the long lead times inherent to skyscraper construction, many of the projects completing in 2019 were conceived and initiated five or more years ago, and thus reflect the development circumstances of a half-decade prior.

However, 2019 proved to be a significant year for some areas that did not already have an abundance of tall buildings, and in some cases, had never been on the 200-meter-plus list before. The African continent and the nation of Algeria alike got a new tallest building: the Great Mosque of Algiers (265 meters). And on the opposite end of Africa, The Leonardo (227 meters) in Johannesburg, South Africa, became that nation’s new tallest building, and the second-tallest building on the continent. Europe also gained a new tallest building, after a long gestation period (including a change of site) – the Lakhta Center (462 meters) in St. Petersburg. And Brazil completed the Infinity Coast Tower (235 meters), which is the country’s first building to exceed 200 meters, despite being a nation of many tall buildings.

Looking into 2020, CTBUH currently projects a similar range for the expected number of completions for 200-meter-plus buildings: between 115 and 145. Of these, between 17 and 30 are expected to be supertalls (300 meters and higher).

View the full and interactive report on The Skyscraper Center.

Related Stories

Market Data | Sep 3, 2020

6 must reads for the AEC industry today: September 3, 2020

New affordable housing comes to the Bronx and California releases guide for state water policy.

Market Data | Sep 2, 2020

Coronavirus has caused significant construction project delays and cancellations

Yet demand for skilled labor is high, new survey finds.

Market Data | Sep 2, 2020

5 must reads for the AEC industry today: September 2, 2020

Precast concrete tower honors United AIrlines Flight 93 victims and public and private nonresidential construction spending slumps.

Market Data | Sep 2, 2020

Public and private nonresidential construction spending slumps in July

Industry employment declines from July 2019 in two-thirds of metros.

Market Data | Aug 31, 2020

5 must reads for the AEC industry today: August 31, 2020

The world's first LEED Platinum integrated campus and reopening campus performance arts centers.

Market Data | Aug 21, 2020

5 must reads for the AEC industry today: August 21, 2020

Student housing in the COVID-19 era and wariness of elevators may stymie office reopening.

Market Data | Aug 20, 2020

6 must reads for the AEC industry today: August 20, 2020

Japan takes on the public restroom and a look at the evolution of retail.

Market Data | Aug 19, 2020

6 must reads for the AEC industry today: August 19, 2020

July architectural billings remained stalled and Florida becomes third state to adopt concrete repair code.

Market Data | Aug 18, 2020

July architectural billings remained stalled

Clients showed reluctance to sign contracts for new design projects during July.

Market Data | Aug 18, 2020

Nonresidential construction industry won’t start growing again until next year’s third quarter

But labor and materials costs are already coming down, according to latest JLL report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021