flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

26-story apartment tower tops out in Silver Spring, Md.

Multifamily Housing

26-story apartment tower tops out in Silver Spring, Md.

The building will be the tallest in Silver Spring.


By David Malone, Managing Editor | July 23, 2021

Solaire 8200 Dixon, a 26-story, 403-unit apartment tower in Silver Spring’s Ripley District, has topped out. The building will become the tallest building in Silver Spring and house the area’s first food hall/city market, which will be open to the public.

The Design Collective-designed tower will include a rooftop fitness center, a pool a sky lounge, a club room with co-working facilities, a catering kitchen, 24-hour concierge and package service, a pet spa, and two guest suites for residents’ use. Of the 403-units, 75% will have one bedroom, with the remainder having two bedrooms.

 

SEE ALSO: HAL Architects designs 'swimmable bridge' that connects two residential buildings

 

The building is a five-minute walk to the Paul S. Sarbanes multimodal transit station, with Metrorail, bus, commuter rail, and trail connections to downtown Washington. The Ripley District includes a mix of dining, shopping, housing, employment, and entertainment options. When completed, the district will be home to 3,000 people with over two million sf of mixed-use development.

In addition to Design Collective, the build team also includes Clark Construction Company as the general contractor and Washington Properties Company as the developer.

Related Stories

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Oct 17, 2011

Austin's newest urban apartment complex under construction

Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 23, 2011

$5M pledge renewed for Habitat for Humanity

The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 20, 2011

Jeanne Gang wins MacArthur Fellowship

Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021