flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$27.5 million renovation of Salah Foundation Children’s Hospital completes in Fort Lauderdale

Healthcare Facilities

$27.5 million renovation of Salah Foundation Children’s Hospital completes in Fort Lauderdale

Skanska USA built the project.


By David Malone, Associate Editor | November 28, 2018
Nautical theme at Salah Foundation Children's Hospital

Courtesy Salah Foundation Children's Hospital

Beginning in 2015, the multi-phase $27.5 million renovation of the Salah Foundation Children’s Hospital at Broward Health Medical Center in Fort Lauderdale, Fla. saw the renovation of inpatient and outpatient areas in various pediatric units across the hospital.

The most significant aspect of the renovation was the addition of 30 private rooms to the Neonatal Intensive Care Unit (NICU), raising its total bed capacity to 63. The rooms were designed to create more space for patients, their families, and hospital staff. Additionally, 12 beds were added to the Pediatric Intensive Care Units, 20 to the Pediatric Step-down Units, and 12 to the Oncology and Hematology departments.

 

Patient room in Salah Foundation Children's HospitalCourtesy Salah Foundation Children's Hospital.

See Also: Orthopedic Associates of Hartford unveils plans for 45,000-sf surgical center

 

A nautical design theme connects all the new rooms throughout each department. This includes custom-built headwalls that feature different sea creatures such as seahorses, dolphins, and sea turtles. Themed play spaces for patients are also included.

Thanks to special precautions taken by Skanska USA during construction, such as utilizing the firms InSite Monitor app that tracks noise, vibration, dust, and differential pressure, the hospital was able to remain open during the duration of the project.

Related Stories

| Sep 19, 2013

Roof renovation tips: Making the choice between overlayment and tear-off

When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.

| Sep 17, 2013

Healthcare project will merge outpatient clinic with YMCA to promote wellness and prevention

Penrose-St. Francis Health Services and the YMCA of the Pikes Peak Region announce collaboration, along with developer The Boldt Company, to create next-generation wellness facility.  

| Sep 16, 2013

Study analyzes effectiveness of reflective ceilings

Engineers at Brinjac quantify the illuminance and energy consumption levels achieved by increasing the ceiling’s light reflectance.

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 10, 2013

The new medical office building: 7 things to know about today’s outpatient clinic

Regulatory pressures, economic constraints, and emerging technologies are transforming healthcare. Learn how Building Teams are responding with efficient, appealing, boundary-blurring outpatient buildings. 

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 4, 2013

Augmented reality goes mainstream: 12 applications for design and construction firms

Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site. 

| Sep 4, 2013

Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show

Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program. 

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021