flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

40 Under 40 retrospective: ‘U40s’ take on continuing ed, snake’s blood

40 Under 40 retrospective: ‘U40s’ take on continuing ed, snake’s blood

Every month we’ll be touching base with past 40 Under 40 honorees to see what’s been happening in their professional and personal lives since winning the award.


By Julie Higginbotham, Senior Editor | August 20, 2013
This article first appeared in the August 2013 issue of BD+C.

Every month we’ll be touching base with past 40 Under 40 honorees to see what’s been happening in their professional and personal lives since winning the award. (U40 alums are invited to participate by sending an update to: jhigginbotham@sgcmail.com.) This month: An accomplished author of test-prep books and an architect who headed to China when the American economy turned sour.

 

 

 

HOLLY WILLIAMS LEPPO
AIA, LEED AP BD+C

Vice President,
Principal Architect
SMB&R, Camp HIll, Pa.
Class of 2009

ACCOMPLISHMENTS
Leppo continues as Principal Architect at SMB&R, a design and structural engineering firm. Recent work includes a 72,000-sf office building and numerous adaptive reuse and renovation projects.

Since 2009, she has continued to write and publish exam review books for Professional Publications Inc. The latest: a series covering the Green Associate and LEED AP BD+C, ID+C, O+M, and Homes exams.

EXTRACURRICULAR
Received the Penn State Alumni Association Alumni Achievement Award in 2010, as well as the Young Alumni Award for Distinction from the Sam Fox School of Design & Visual Arts, Washington University in St. Louis.

Named one of 25 Women of Influence in central Pennsylvania by the Central Penn Business Journal in 2011.

Named to the Board of Directors of the Central Pennsylvania AIA in 2010. 

Serves on the Board of Directors of Central Pennsylvania for Hugh O’Brian Youth Leadership, an international development organization for high school students. 

OFF THE CLOCK
Leppo stays busy raising two young sons while grappling with a residential reconstruction job. “I am still—still!—working on fixing up our old farmhouse. This is a never-ending project.”

 

 

CLAY VOGEL, AIA

Co-President, Design Principal
KaziaLi Design Collaborative
Tianjin, People’s Republic of China
Class of 2008

ACCOMPLISHMENTS
In the wake of the 2008 economic crash—which devastated his Chicago firm, Kazia Design Collaborative—Vogel joined forces with Chinese partner Li Chunguang to regroup in Tianjin. Renamed KaziaLi, the firm later expanded to London and Shanghai, and re-established Chicago operations through an alliance with PFB Architects. Currently eyeing growth opportunities in Africa and India.

Working on: Changhong Electric Technology Company’s International R&D Center in Chengdu, comprising 38-floor and 20-floor office towers connected by a 10,000-sm podium level for amenities, plus a 2,000-sm museum and exhibition space. The design incorporates both Western and feng shui principles.

EXTRACURRICULAR
In 2010, Vogel opened a real estate firm to deal with development issues outside the scope of the primary architectural practice.
With local partner Wang Jianli, KaziaLi recently built a pro bono facility for the 200-student Chihui School in Tibet, which had formerly operated only in tents.

OFF THE CLOCK
Vogel often combines work with recreational travel, from the grasslands of Inner Mongolia to the mountains of Sichuan to the Pearl River Delta in Guangdong. “Having an open mind and a willingness to accept other people’s culture has landed me in tricky business dinners where I have consumed snake’s blood and the gallbladder, ears, feet, lungs, and hearts of various other animals,” he says.

 


 

DON’T MISS THIS YEAR’S U40 LEADERSHIP SUMMIT
Join our 40 Under 40 alumni and other outstanding young AEC professionals nominated by their firms at the 3rd Annual Under 40 Leadership Summit (Hyatt Regency San Francisco, October 9-11). REGISTRATION INFORMATION

Related Stories

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021