flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

40 Under 40 retrospective: Where are they now?

40 Under 40 retrospective: Where are they now?

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.


By Julie Higginbotham, Senior Editor | October 2, 2013

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.

 

 

 

 

 

 

 

 

BRET EMERSON

President and Owner
Commtech Design, Rockford, Mich.
Class of 2006

ACCOMPLISHMENTS
Emerson continues as owner of Commtech, which specializes in networking, security, and A/V design. Government clients who need video security and access control systems are a key market. “We are a growing company that has survived the recession well. The world wants more cameras and access control.”

Working with Michigan’s Department of Corrections to design a new video security system for all facilities statewide.

Also working on: court building for Kalamazoo County; health sciences building for Baker College, Muskegon, Mich.; new telephone system for 26 buildings operated by the Traverse City Area Public Schools.

EXTRACURRICULAR
Regular presenter on security technology design at conferences and meetings (Michigan Department of Corrections, Michigan Department of Education).

Member, Plainfield (Mich.) Township Zoning Board of Appeals.

OFF THE CLOCK
Emerson is building a house, runs to stay in shape, and dabbles in farming. “I have started growing pumpkins as a hobby. It isn’t office work, and it gets me outside. It ties me back to my youth growing up on a farm.”

 

 

 

LORI JAMES
IIDA, NCIDQ, LEED AP ID+C

Principal
SmithGroupJJR, Detroit
Class of 2012

ACCOMPLISHMENTS
Since her U40 recognition, James has been promoted to a Principal and stockholder, and elevated to lead the Interior Design group in Detroit.

Represents her site in the companywide Interior Design Discipline Committee, which develops standards and best practices.  Has assumed new responsibilities with the firm’s Workplace Practice and led virtual training to teach nationwide staff about the proprietary WorkSIM database and planning tool.

Participated in a two-day Client Advisory Board hosted by the firm’s Learning Practice, attended by leaders in the nursing and allied health community.

EXTRACURRICULAR
Selected for the Urban Land Institute-Michigan’s Larson Center for Leadership, an eight-month program covering land use and economic, governmental, and infrastructure issues.

Mentors interior design students at Wayne State and Michigan State universities.

Leads the firm’s local involvement in Herman Miller’s annual holiday WeCare event, benefiting the Boys & Girls Clubs of America.

Committee member, DIFFA Dining by Design auction and gala supporting the Michigan AIDS Coalition.

OFF THE CLOCK
James has recently taken up aerial yoga. “There is something incredibly exhilarating about suspending yourself in a fabric trapeze. It is physically and mentally challenging. You have to trust in your personal strength and flexibility, as well as the trapeze.”

 


 

LAST CHANCE! SIGN UP FOR THIS YEAR'S U40 LEADERSHIP SUMMIT

Join our 40 Under 40 alumni and other outstanding young AEC professionals nominated by their firms at the 3rd Annual Under 40 Leadership Summit (Hyatt Regency San Francisco, October 9-11). Visit our website for information about this inspiring, AIA-accredited opportunity for learning and networking: www.BDCnetwork.com/Under40Summit/index.html.

Related Stories

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 12, 2011

Bulley & Andrews celebrates 120 years of construction

The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction. 

| Oct 12, 2011

Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health

  Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will

| Oct 11, 2011

AIA introduces five new documents for use on sustainable projects

These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

| Oct 11, 2011

Ballard Spahr launches real estate recovery group

  The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment. 

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021