flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

40 Under 40 retrospective: Where are they now?

40 Under 40 retrospective: Where are they now?

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.


By Julie Higginbotham, Senior Editor | October 2, 2013

BD+C catches up with two past 40 Under 40 honorees: a designer who credits trapeze work with boosting her confidence, and a security expert who also knows a lot about squash.

 

 

 

 

 

 

 

 

BRET EMERSON

President and Owner
Commtech Design, Rockford, Mich.
Class of 2006

ACCOMPLISHMENTS
Emerson continues as owner of Commtech, which specializes in networking, security, and A/V design. Government clients who need video security and access control systems are a key market. “We are a growing company that has survived the recession well. The world wants more cameras and access control.”

Working with Michigan’s Department of Corrections to design a new video security system for all facilities statewide.

Also working on: court building for Kalamazoo County; health sciences building for Baker College, Muskegon, Mich.; new telephone system for 26 buildings operated by the Traverse City Area Public Schools.

EXTRACURRICULAR
Regular presenter on security technology design at conferences and meetings (Michigan Department of Corrections, Michigan Department of Education).

Member, Plainfield (Mich.) Township Zoning Board of Appeals.

OFF THE CLOCK
Emerson is building a house, runs to stay in shape, and dabbles in farming. “I have started growing pumpkins as a hobby. It isn’t office work, and it gets me outside. It ties me back to my youth growing up on a farm.”

 

 

 

LORI JAMES
IIDA, NCIDQ, LEED AP ID+C

Principal
SmithGroupJJR, Detroit
Class of 2012

ACCOMPLISHMENTS
Since her U40 recognition, James has been promoted to a Principal and stockholder, and elevated to lead the Interior Design group in Detroit.

Represents her site in the companywide Interior Design Discipline Committee, which develops standards and best practices.  Has assumed new responsibilities with the firm’s Workplace Practice and led virtual training to teach nationwide staff about the proprietary WorkSIM database and planning tool.

Participated in a two-day Client Advisory Board hosted by the firm’s Learning Practice, attended by leaders in the nursing and allied health community.

EXTRACURRICULAR
Selected for the Urban Land Institute-Michigan’s Larson Center for Leadership, an eight-month program covering land use and economic, governmental, and infrastructure issues.

Mentors interior design students at Wayne State and Michigan State universities.

Leads the firm’s local involvement in Herman Miller’s annual holiday WeCare event, benefiting the Boys & Girls Clubs of America.

Committee member, DIFFA Dining by Design auction and gala supporting the Michigan AIDS Coalition.

OFF THE CLOCK
James has recently taken up aerial yoga. “There is something incredibly exhilarating about suspending yourself in a fabric trapeze. It is physically and mentally challenging. You have to trust in your personal strength and flexibility, as well as the trapeze.”

 


 

LAST CHANCE! SIGN UP FOR THIS YEAR'S U40 LEADERSHIP SUMMIT

Join our 40 Under 40 alumni and other outstanding young AEC professionals nominated by their firms at the 3rd Annual Under 40 Leadership Summit (Hyatt Regency San Francisco, October 9-11). Visit our website for information about this inspiring, AIA-accredited opportunity for learning and networking: www.BDCnetwork.com/Under40Summit/index.html.

Related Stories

| Aug 17, 2022

Focusing on building envelope design and commissioning

Building envelope design is constantly evolving as new products and assemblies are developed.

| Aug 17, 2022

New York to deploy 30,000 window-sized electric heat pumps in city-owned apartments

New York officials recently announced the state and the city will invest $70 million to roll out 30,000 window-sized electric heat pumps in city-owned apartments.

| Aug 17, 2022

IBM’s former office buildings in Boca Raton turn into a modern tech campus

Built in 1968, the Boca Raton Innovation Campus (BRiC), at 1.7 million square feet, is the largest office campus in Florida.

| Aug 16, 2022

DOE funds 18 projects developing tech to enable buildings to store carbon

The Department of Energy announced $39 million in awards for 18 projects that are developing technologies to transform buildings into net carbon storage structures.

| Aug 16, 2022

Multifamily holds strong – for now

All leading indicators show that the multifamily sector is shrugging off rising interest rates, inflationary pressures and other economic challenges, and will continue to be a torrid market for design and construction firms for at least the rest of 2022.

| Aug 16, 2022

Cedars-Sinai Urgent Care Clinic’s high design for urgent care

The new Cedars-Sinai Los Feliz Urgent Care Clinic in Los Angeles plays against type, offering a stylized design to what are typically mundane, utilitarian buildings. 

| Aug 15, 2022

IF you build it, will they come? The problem of staff respite in healthcare facilities

Architects and designers have long argued for the value of respite spaces in healthcare facilities.

| Aug 15, 2022

Boston high-rise will be largest Passive House office building in the world

Winthrop Center, a new 691-foot tall, mixed-use tower in Boston was recently honored with the Passive House Trailblazer award.

| Aug 12, 2022

Monthly Construction Input Prices Decreased 2% in July, Up 17% From a Year Ago, Says ABC

Construction input prices decreased 1.8% in July compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics’ Producer Price Index data released today.

Hotel Facilities | Aug 12, 2022

Denver builds the nation’s first carbon-positive hotel

Touted as the nation’s first carbon-positive hotel, Populus recently broke ground in downtown Denver.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021