flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 must reads for the AEC industry today: April 17, 2020

Market Data

5 must reads for the AEC industry today: April 17, 2020

Meet the 'AEC outsiders' pushing the industry forward and the world's largest Living Building.


By BD+C Editors | April 17, 2020


1. Meet the ‘AEC outsiders’ who are helping to push the industry into the new decade (BD+C)
"As part of BD+C’s 2019 Giants 300 Technology and Innovation Study, 130 of the nation’s largest AEC firms were polled on a variety of topics, including whether or not the firm had a non-AEC hire in the past 24 months. Nearly two-thirds (63.8%) reported that they had hired an “AEC outsider” in this time period."

2. This will be the largest Living Building in the world
"Designed to last 500 years, the building has a projected Energy Use Index (EUI) of 18.6 kBtu/SF/YR; a typical Portland office building built to code has a EUI of 40.8 kBtu/SF/YR. A 133 kW PV solar array will occupy 8,300 sf on the building's roof and another 195.4 kW PV array will occupy 10,300 sf on the roof of a partner organization."

3. Boston mayor considers 'slow ramp-up' for construction (Boston Business Journal) 
"Boston Mayor Martin J. Walsh intends to speak with construction leaders in the next few days to discuss potentially restarting construction within the city, which Walsh halted in March in response to the coronavirus pandemic."

4. Building officials turn to video inspections to mitigate COVID-19 risk (Construction Dive)
"Building inspectors from Ohio, Nevada and Florida found common benefits to performing inspections using inexpensive tools like Facetime, Skype, Google Duo and Microsoft Teams. These include being able to perform inspections earlier in the day since they don't have to physically start their day in the office and then spend time driving to the project. The consensus was that as long as the inspection would be visually-based under normal circumstances, an inspection via video is acceptable."

5. Construction project on hold? Don't forget to maintain stored equipment (Karpinski Engineering) 
"One of the downstream effects of the COVID-19 pandemic is that many owners are placing their construction projects on hold. As they do so, they need to make sure that they are properly storing any equipment that has been delivered — or even installed — that will not be operational while the project is on hold," writes Karpinski Engineering's Lee Hodkey.

 

For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter

Related Stories

Industry Research | Aug 29, 2019

Construction firms expect labor shortages to worsen over the next year

A new AGC-Autodesk survey finds more companies turning to technology to support their jobsites.

Market Data | Aug 21, 2019

Architecture Billings Index continues its streak of soft readings

Decline in new design contracts suggests volatility in design activity to persist.

Market Data | Aug 19, 2019

Multifamily market sustains positive cycle

Year-over-year growth tops 3% for 13th month. Will the economy stifle momentum?

Market Data | Aug 16, 2019

Students say unclean restrooms impact their perception of the school

The findings are part of Bradley Corporation’s Healthy Hand Washing Survey.

Market Data | Aug 12, 2019

Mid-year economic outlook for nonresidential construction: Expansion continues, but vulnerabilities pile up

Emerging weakness in business investment has been hinting at softening outlays.

Market Data | Aug 7, 2019

National office vacancy holds steady at 9.7% in slowing but disciplined market

Average asking rental rate posts 4.2% annual growth.

Market Data | Aug 1, 2019

Nonresidential construction spending slows in June, remains elevated

Among the 16 nonresidential construction spending categories tracked by the Census Bureau, seven experienced increases in monthly spending.

Market Data | Jul 31, 2019

For the second quarter of 2019, the U.S. hotel construction pipeline continued its year-over-year growth spurt

The growth spurt continued even as business investment declined for the first time since 2016.

Market Data | Jul 20, 2019

Construction costs continued to rise in second quarter

Labor availability is a big factor in that inflation, according to Rider Levett Bucknall report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021