flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 must reads for the AEC industry today: April 17, 2020

Market Data

5 must reads for the AEC industry today: April 17, 2020

Meet the 'AEC outsiders' pushing the industry forward and the world's largest Living Building.


By BD+C Editors | April 17, 2020


1. Meet the ‘AEC outsiders’ who are helping to push the industry into the new decade (BD+C)
"As part of BD+C’s 2019 Giants 300 Technology and Innovation Study, 130 of the nation’s largest AEC firms were polled on a variety of topics, including whether or not the firm had a non-AEC hire in the past 24 months. Nearly two-thirds (63.8%) reported that they had hired an “AEC outsider” in this time period."

2. This will be the largest Living Building in the world
"Designed to last 500 years, the building has a projected Energy Use Index (EUI) of 18.6 kBtu/SF/YR; a typical Portland office building built to code has a EUI of 40.8 kBtu/SF/YR. A 133 kW PV solar array will occupy 8,300 sf on the building's roof and another 195.4 kW PV array will occupy 10,300 sf on the roof of a partner organization."

3. Boston mayor considers 'slow ramp-up' for construction (Boston Business Journal) 
"Boston Mayor Martin J. Walsh intends to speak with construction leaders in the next few days to discuss potentially restarting construction within the city, which Walsh halted in March in response to the coronavirus pandemic."

4. Building officials turn to video inspections to mitigate COVID-19 risk (Construction Dive)
"Building inspectors from Ohio, Nevada and Florida found common benefits to performing inspections using inexpensive tools like Facetime, Skype, Google Duo and Microsoft Teams. These include being able to perform inspections earlier in the day since they don't have to physically start their day in the office and then spend time driving to the project. The consensus was that as long as the inspection would be visually-based under normal circumstances, an inspection via video is acceptable."

5. Construction project on hold? Don't forget to maintain stored equipment (Karpinski Engineering) 
"One of the downstream effects of the COVID-19 pandemic is that many owners are placing their construction projects on hold. As they do so, they need to make sure that they are properly storing any equipment that has been delivered — or even installed — that will not be operational while the project is on hold," writes Karpinski Engineering's Lee Hodkey.

 

For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter

Related Stories

Market Data | Sep 19, 2018

August architecture firm billings rebound as building investment spurt continues

Southern region, multifamily residential sector lead growth.

Market Data | Sep 18, 2018

Altus Group report reveals shifts in trade policy, technology, and financing are disrupting global real estate development industry

International trade uncertainty, widespread construction skills shortage creating perfect storm for escalating project costs; property development leaders split on potential impact of emerging technologies.

Sponsored | Market Data | Sep 17, 2018

Construction Contract Issues?

Market Data | Sep 17, 2018

ABC’s Construction Backlog Indicator hits a new high in second quarter of 2018

Backlog is up 12.2% from the first quarter and 14% compared to the same time last year.

Market Data | Sep 12, 2018

Construction material prices fall in August

Softwood lumber prices plummeted 9.6% in August yet are up 5% on a yearly basis (down from a 19.5% increase year-over-year in July).

Market Data | Sep 7, 2018

Safety risks in commercial construction industry exacerbated by workforce shortages

The report revealed 88% of contractors expect to feel at least a moderate impact from the workforce shortages in the next three years.

Market Data | Sep 5, 2018

Public nonresidential construction up in July

Private nonresidential spending fell 1% in July, while public nonresidential spending expanded 0.7%.

Market Data | Aug 30, 2018

Construction in ASEAN region to grow by over 6% annually over next five years

Although there are disparities in the pace of growth in construction output among the ASEAN member states, the region’s construction industry as a whole will grow by 6.1% on an annual average basis in the next five years.

Market Data | Aug 22, 2018

July architecture firm billings remain positive despite growth slowing

Architecture firms located in the South remain especially strong.

Market Data | Aug 15, 2018

National asking rents for office space rise again

The rise in rental rates marks the 21st consecutive quarterly increase.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021