flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

6 must reads for the AEC industry today: April 13, 2020

Market Data

6 must reads for the AEC industry today: April 13, 2020

How prefab can enable the AEC industry to quickly create new hospital beds and Abu Dhabi launches a design competition focused on reducing urban heat island effect.


By BD+C Editors | April 13, 2020


1. The role of higher education housing in fighting COVID-19 (Clark Nexsen)
Distance learning, remote work, and the need for emergency medical facilities may forever change the way these spaces are designed and use—and a new emphasis on serving the community, regardless of primary function, has emerged.

2. How prefab can enable the design and construction industry to bring much needed beds to hospitals, faster (Autodesk)
The outbreak of COVID-19 represents an unprecedented test for the global healthcare system.

3. HGA and The Boldt Company devise a prefabricated temporary hospital to manage surge capacity during a viral crisis (BD+C)
A STAAT Mod system can be ready to receive patients in less than a month.

4. Only 69% of apartment residents have paid April rent, but that number isn't the full story (Bisnow)
Only 69% of apartment households in the U.S. paid their monthly rent by April 5, falling by 12% from the collection rate recorded a month ago, according to data released by the National Multifamily Housing Council Wednesday. The percentage of households that have paid their April rent also fell 13% from the same date in 2019, NMHC said

5. Cushman & Wakefield launches Recovery Readiness Task Force (Cushman & Wakefield) 
The Recovery Readiness Task Force (RRTF) to lead the development of best practices, products and partnerships to prepare clients for post-COVID-19 recovery and the eventual return to the workplace. Additionally, Cushman & Wakefield has launched a new office design concept on its website, which can be found at www.SixFeetOffice.com, showcasing a new social distancing program developed by the firm and being piloted in The Netherlands.

6. Design competition focuses on reducing urban heat island effect (BD+C)
An international design competition hosted by the United Arab Emirates’ Department of Municipalities and Transport is focused on reducing the urban heat island effect.

 


For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter

Related Stories

Market Data | Apr 20, 2021

Demand for design services continues to rapidly escalate

AIA’s ABI score for March rose to 55.6 compared to 53.3 in February.

Market Data | Apr 16, 2021

Construction employment in March trails March 2020 mark in 35 states

Nonresidential projects lag despite hot homebuilding market.

Market Data | Apr 13, 2021

ABC’s Construction Backlog slips in March; Contractor optimism continues to improve

The Construction Backlog Indicator fell to 7.8 months in March.

Market Data | Apr 9, 2021

Record jump in materials prices and supply chain distributions threaten construction firms' ability to complete vital nonresidential projects

A government index that measures the selling price for goods used construction jumped 3.5% from February to March.

Contractors | Apr 9, 2021

Construction bidding activity ticks up in February

The Blue Book Network's Velocity Index measures month-to-month changes in bidding activity among construction firms across five building sectors and in all 50 states. 

Industry Research | Apr 9, 2021

BD+C exclusive research: What building owners want from AEC firms

BD+C’s first-ever owners’ survey finds them focused on improving buildings’ performance for higher investment returns.

Market Data | Apr 7, 2021

Construction employment drops in 236 metro areas between February 2020 and February 2021

Houston-The Woodlands-Sugar Land and Odessa, Texas have worst 12-month employment losses.

Market Data | Apr 2, 2021

Nonresidential construction spending down 1.3% in February, says ABC

On a monthly basis, spending was down in 13 of 16 nonresidential subcategories.

Market Data | Apr 1, 2021

Construction spending slips in February

Shrinking demand, soaring costs, and supply delays threaten project completion dates and finances.

Market Data | Mar 26, 2021

Construction employment in February trails pre-pandemic level in 44 states

Soaring costs, supply-chain problems jeopardize future jobs.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â