GEOMETRIC PANELS COME WITH ONLINE DESIGN TOOL
Smith & Fong’s line of bamboo wall panels now includes Fractal, a customizable geometric pattern based on the isosceles triangle. Designers can use the maker’s online design tool, Fractool, to create unique wall patterns. Comes with a blueprint of how to assemble and install the panels. Fractal panels (24x24x34 inches) are fabricated using Plyboo RealCore bamboo. Available with FSC 100%-certified bamboo and in natural, amber, fog, mist, greige, and noir.
SPACE-SAVING BIKE PARKING SYSTEM
The Dero Decker two-tiered bike parking system has been made easier to install and operate. The top trays are 40 pounds lighter than legacy models and offer smooth, quiet movement when raising and lowering the trays. Installation requires 60% less drilling into the floor. A bolting footplate guide eliminates the need to measure the position of the lower trays during installation. Front-wheel safety locking lever and tray dampers enhance safety when lowering the upper trays. Accommodates u-locks for added security. Fat-bike tray available.
STACKED STONE LOOK GIVES DESIGNERS LOTS OF OPTIONS
The Stacked Stone collection from Eldorado Stone provides the classic aesthetic and precision of hand-laid dry-stack stone with the installation and maintenance benefits of a panel system. Project teams can create authentic-looking stacked stone walls and column fascias. The stones measure four inches high and range in length from eight inches to 20 inches, and in depths from 0.625 inches to two inches. Available in more than a dozen profiles, including Chapel Hill, Nantucket, and Santa Fe.
COMPACT FREESTANDING TUB CAN SQUEEZE INTO TIGHT SPACES
Measuring just 56x29 inches, the Vetralla tub from Victoria+Albert is designed for contemporary bathrooms where space is at a premium. The tub is made from V+A’s Quarrycast mix of volcanic limestone and resins that creates a high-gloss, bright-white luster. Available in white, matte white, gloss black, light grey, matte black, anthracite, and stone grey.
VERSATILE PREP SINK WILL simply BOWL YOU OVER
Lenova’s Permaclean Apron Front Ledge Prep Sink has an engineered platform ledge that allows the unit to turn into a food prep center, complete with an optional stainless steel colander, roll-up grid drainer, and bamboo cutting board. Available in single- or double-bowl configuration. A low divider in the double-bowl layout accommodates big pots with long handles. Seamless drain system, removable splashguards, and strainer baskets included.
GLASS WALLS MAXIMIZE VIEWS AT N.J. LUXURY APARTMENT TOWER
To open up views from their new seven-story, 80-unit luxury rental apartment tower in Hackensack, N.J., property owner/GC Petrone Building Corp. and designer Virgona & Virgona Architects installed 883 energy-efficient windows and doors at The Vue to create floor-to-ceiling glass walls. The aluminum window walls use Crystal Window & Door Systems’ two- and three-lite sliders, fixed windows, swing terrace doors, and sliding patio doors. The window wall can span openings up to 212 inches in width and 96 inches in height.
Related Stories
Resiliency | Sep 3, 2024
Phius introduces retrofit standard for more resilient buildings
Phius recently released, REVIVE 2024, a retrofit standard for more resilient buildings. The standard focuses on resilience against grid outages by ensuring structures remain habitable for at least a week during extreme weather events.
Products and Materials | Aug 31, 2024
Top building products for August 2024
BD+C Editors break down August's top 15 building products, from waterproof wall panel systems to portable indoor pickleball surface solutions.
Adaptive Reuse | Aug 29, 2024
More than 1.2 billion sf of office space have strong potential for residential conversion
More than 1.2 billion sf of U.S. office space—14.8% of the nation’s total—have strong potential for conversion to residential use, according to real estate software and services firm Yardi. Yardi’s new Conversion Feasibility Index scores office buildings on their suitability for multifamily conversion.
Adaptive Reuse | Aug 28, 2024
Cities in Washington State will offer tax breaks for office-to-residential conversions
A law passed earlier this year by the Washington State Legislature allows developers to defer sales and use taxes if they convert existing structures, including office buildings, into affordable housing.
Affordable Housing | Aug 27, 2024
Not gaining community support is key barrier to more affordable housing projects
In a recent survey, builders and planners cited difficulty in generating community support as a key challenge to getting more affordable housing projects built. The survey by coUrbanize found that 94% of respondents tried to gain community input and support through public meetings, but many were frustrated by low attendance. Few respondents thought the process was productive.
Adaptive Reuse | Aug 22, 2024
6 key fire and life safety considerations for office-to-residential conversions
Office-to-residential conversions may be fraught with fire and life safety challenges, from egress requirements to fire protection system gaps. Here are six important considerations to consider.
Multifamily Housing | Aug 21, 2024
Nation's leading multifamily developer expands into infrastructure
Greystar's strategy for infrastructure is driven by the shifting landscape of today's cities—primarily in the increased digitization, urbanization, and transitions to clean energy.
MFPRO+ New Projects | Aug 20, 2024
Seattle workforce housing project inspired by geology of eastern Washington
J.G. Whittier Apartments, a workforce housing project in Seattle uses the geology of eastern Washington as inspiration for the design. The architecture and interior design celebrate geometric anomalies found in nature. At the corners of the building, blackened wood siding “erodes” to expose vibrant murals underneath.
MFPRO+ New Projects | Aug 16, 2024
At 60 stories, the Paramount multifamily development will stand as Nashville’s tallest high rise
When complete, the 60-story Paramount building, at 750 feet high, will be the tallest high rise tower in Nashville, Tenn., surpassing the city’s current record holder, the 617-foot AT&T Building. The $390 million Paramount project recently launched condo sales after securing more than $230 million in construction financing.
Curtain Wall | Aug 15, 2024
7 steps to investigating curtain wall leaks
It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus.