flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

7 must reads for the AEC industry today: April 7, 2020

Market Data

7 must reads for the AEC industry today: April 7, 2020

Leo A Daly's Hotel2Hospital prototype takes shape, while the number of delayed projects reaches 2,550 in the U.S. amid coronavirus pandemic.


By BD+C Editors | April 7, 2020
7 must reads for the AEC industry today: April 7, 2020
7 must reads for the AEC industry today: April 7, 2020

 

1. As cities scramble for hospital beds to treat COVID-19 patients, Leo A Daly offers a hotel-to-hospital solution (BD+C)
Leo A Daly is currently negotiating with several hoteliers about converting large portfolios of hotels into healthcare facilities that follow the firm’s Hotel2Hospital prototype, which would conform with design guidelines released last week to state governments by the U.S. Army Corps of Engineers, which relax some of the hospital safety standards.

2. New South Korean retail building looks like a molting insect (BD+C)
The building, Galleria’s sixth branch, has a very unique design to say the least. The facade combines multifaceted glass that appears to be breaking out from within opaque stone, as if the building was shedding its old skin and revealing the new.

3. How to convert college dorms to support the coronavirus crisis (NBBJ)
With the number of global coronavirus cases increasing each day, health centers are more burdened than ever before, witnessing severe bed shortages for critically-ill patients. At the same time, housing at many higher education institutions now stands mostly vacant — with hundreds of thousands of students home for social distancing and instruction now delivered online.

4. COVID-19's impact on the multifamily sector (BD+C)
COVID-19 is taking its toll on the U.S. vertical construction market. In a March 23-26 survey by the Associated General Contractors of America, 20% of the 659 respondents from "buildings contractors" reported projects being shut down or delayed by government officials, while 45% of those surveyed said an owner had instructed them to halt or cancel construction on a current or planned project.

5. Number of confirmed delayed projects reaches 2,550 in the U.S., 1,350 in Canada (ConstructConnect)
ConstructConnect's Delayed Project Tracker is updated daily. 

6. Climate-informed HVAC increases in relative humidity may fight pandemic viruses (SmithGroup)
Indoor relative humidity is a function of seasonal climate and building HVAC. The range of 40% to 60% RH may reduce contagion and help those who are infected.

7. Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility (Walsh Construction)
"Walsh Construction is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility for novel coronavirus patients."


For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter


 

Related Stories

Market Data | Jul 18, 2019

Construction contractors remain confident as summer begins

Contractors were slightly less upbeat regarding profit margins and staffing levels compared to April.

Market Data | Jul 17, 2019

Design services demand stalled in June

Project inquiry gains hit a 10-year low.

Market Data | Jul 16, 2019

ABC’s Construction Backlog Indicator increases modestly in May

The Construction Backlog Indicator expanded to 8.9 months in May 2019.

K-12 Schools | Jul 15, 2019

Summer assignments: 2019 K-12 school construction costs

Using RSMeans data from Gordian, here are the most recent costs per square foot for K-12 school buildings in 10 cities across the U.S.

Market Data | Jul 12, 2019

Construction input prices plummet in June

This is the first time in nearly three years that input prices have fallen on a year-over-year basis.

Market Data | Jul 1, 2019

Nonresidential construction spending slips modestly in May

Among the 16 nonresidential construction spending categories tracked by the Census Bureau, five experienced increases in monthly spending.

Market Data | Jul 1, 2019

Almost 60% of the U.S. construction project pipeline value is concentrated in 10 major states

With a total of 1,302 projects worth $524.6 billion, California has both the largest number and value of projects in the U.S. construction project pipeline.

Market Data | Jun 21, 2019

Architecture billings remain flat

AIA’s Architecture Billings Index (ABI) score for May showed a small increase in design services at 50.2.

Market Data | Jun 19, 2019

Number of U.S. architects continues to rise

New data from NCARB reveals that the number of architects continues to increase. 

Market Data | Jun 12, 2019

Construction input prices see slight increase in May

Among the 11 subcategories, six saw prices fall last month, with the largest decreases in natural gas.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021