flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

7 must reads for the AEC industry today: June 5, 2020

Market Data

7 must reads for the AEC industry today: June 5, 2020

The world's first carbon-fiber reinforced concrete building and what will college be like in the fall?


By BD+C Editors | June 5, 2020


1. The world’s first building made from carbon-fiber reinforced concrete starts construction in Germany (BD+C) 
"This 5 million Euro (US$5.63 million) project, which was delayed because of the coronavirus outbreak, is now scheduled for completion next spring. It consists of two parts: a precast “box”; and the “twist,” a double-curved roof that the lighter-weight and bendable composite facilitates. This university building—with classroom, lab, and presentation spaces, and a small kitchen—will be distinguished by its 24-meter length of seamless concrete."

2. Vermont’s Burr and Burton Academy expansion will feature mass timber and flexible spaces (BD+C) 
"
The 25,000-sf expansion, designed by KaTo and ZGF Architects, will comprise interdisciplinary classrooms and the school’s library on BBA’s upper campus."

3. American Wood Council updates report on fire resistance of wood members and assemblies (BD+C) 
"
Provides new examples and background on mass timber calculations."

4. IMEG Corp. acquires Cardno Structural Engineering (IMEG) 
"
The team joined IMEG on May 29."

5. What Will College Be Like in the Fall? (New York Times)
"Administrators, professors, a union representative and students consider the new realities of life on campus in the midst of a pandemic."

6. Mall Stocks Surge with Shoppers Coming Back Faster Than Expected (Bloomberg via National Real Estate Investor)
"At North Carolina centers owned by Tanger traffic was at 80 percent of pre-pandemic levels."

7. Coronavirus Shock Could Upend Las Vegas Economy for Years (WSJ)
"Pandemic hit Nevada’s workforce harder than any other U.S. state and poses a potentially existential threat to the city’s business model."

 

 

 
 

Related Stories

Market Data | Jun 16, 2021

Construction input prices rise 4.6% in May; softwood lumber prices up 154% from a year ago

Construction input prices are 24.3% higher than a year ago, while nonresidential construction input prices increased 23.9% over that span.

Market Data | Jun 16, 2021

Producer prices for construction materials and services jump 24% over 12 months

The 24.3% increase in prices for materials used in construction from May 2020 to last month was nearly twice as great as in any previous year

Market Data | Jun 15, 2021

ABC’s Construction Backlog inches higher in May

Materials and labor shortages suppress contractor confidence.

Market Data | Jun 11, 2021

The countries with the most green buildings

As the country that set up the LEED initiative, the US is a natural leader in constructing green buildings.

Market Data | Jun 7, 2021

Construction employment slips by 20,000 in May

Seasonally adjusted construction employment in May totaled 7,423,000.

Market Data | Jun 2, 2021

Construction employment in April lags pre-covid February 2020 level in 107 metro areas

Houston-The Woodlands-Sugar Land and Odessa, Texas have worst 14-month construction job losses.

Market Data | Jun 1, 2021

Nonresidential construction spending decreases 0.5% in April

Spending was down on a monthly basis in nine of 16 nonresidential subcategories.

Market Data | Jun 1, 2021

Nonresidential construction outlays drop in April to two-year low

Public and private work declines amid supply-chain woes, soaring costs.

Market Data | May 24, 2021

Construction employment in April remains below pre-pandemic peak in 36 states and D.C.

Texas and Louisiana have worst job losses since February 2020, while Utah and Idaho are the top gainers.

Market Data | May 19, 2021

Design activity strongly increases

Demand signals construction is recovering.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021