flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$80 million in export financing for solar project in India

$80 million in export financing for solar project in India

The project, “Rajasthan Sun Technique Energy Private Limited,” is a subsidiary of Reliance Power and is being co-financed by the Asian Development Bank and FMO, the Dutch development bank.


By By BD+C Staff | April 16, 2012
The MOU proposed the purchase of 900 megawatts of renewable energy generating eq
The MOU proposed the purchase of 900 megawatts of renewable energy generating equipment, in addition to the purchase of 8,000MWs

Supporting U.S. jobs at companies in eight states, the board of directors of the Export-Import Bank of the United States (Ex-Im Bank) approved an $80.32 million direct loan for the purchase of concentrated solar power technology by Reliance Power, Ltd. in Rajasthan, India.

The project, “Rajasthan Sun Technique Energy Private Limited,” is a subsidiary of Reliance Power and is being co-financed by the Asian Development Bank and FMO, the Dutch development bank.

While accompanying President Obama on his trip to India in November, 2010, Ex-Im Bank Chairman and President Fred P. Hochberg signed a $5 billion Memorandum of Understanding (MOU) with Anil Ambani, Chairman of Reliance Power. The MOU proposed the purchase of 900 megawatts of renewable energy generating equipment, in addition to the purchase of 8,000MWs of gas-fired technology from U.S. manufacturers and service providers over a period of five years. Since then, Ex-Im Bank has financed $760 million in three Reliance Power renewable energy transactions supporting 165 megawatts of solar and 2400MWs of gas.

U.S. companies potentially involved in the transaction include AREVA Solar Inc. (Mountain View, Calif.); E.I. DuPont de Nemours and Co. (Wilmington, Del.); Clifford Chance Rogers Wells LLP (Washington, D.C.); 3M Company (St. Paul, Minn.); Sika Corp. (Lyndhurst, N.J.); CCI Corp. (Tulsa, Okla.); Certainteed Corp. (Valley Forge, Pa.); Huck International Inc. (Waco, Texas); and Weed Instrument Company Inc. (Round Rock, Texas). BD+C

Related Stories

| Nov 22, 2011

New Green Matters Conference examines emerging issues in concrete and sustainability

High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 21, 2011

Mortenson and enXco partnership to build its 19th wind project

The 8,500 acres project will generate140 megawatts of wind power – enough energy to power approximately 39,000 homes.

| Nov 21, 2011

FDH Engineering acquires Energy Solutions

All ESI employees have been merged into FDH’s staff at its St. Louis office.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

SmithGroup changes name to SmithGroupJJR

SmithGroup and JJR join brands to become a single, multi-disciplinary company.

| Nov 17, 2011

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021