Early results from MULTIFAMILY Design+Construction's inaugural Kitchen + Bath survey of multifamily developers, architects, contractors, and other specifiers make it clear that supply chain problems are impacting apartment, condo, and townhome projects.
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
HOW COVID, UKRAINE WAR ARE IMPACTING SPECIFIERS
We asked: "What K+B amenities have you had DIFFICULTY SOURCING due to the Covid pandemic or Ukraine war? What are you doing about this?"
Appliances came up more often than any other product category. "We've been purchasing them early and storing in our own warehouses or changing our spec to purchase models that are in stock/available," said one respondent.
"It's been difficult getting appliance packages with the same manufacturer," said another respondent. "We're needing to mix manufacturers and appliances."
Yet another said, of appliances, "We're ordering early and being more flexible, less committed on specific brands or models."
"We had to take early delivery of the appliances (way ahead of schedule), because otherwise they'd be given to another project," said a respondent. "As a result, we had to find storage for the appliances."
Stackable washer/dryer combos were In short supply, according to one respondent.
THE GREAT REFRIGERATOR VANISHING ACT OF 2022
Refrigerators were the main culprit, according to early survey respondents. One respondent was very specific: "French door refrigerators."
But most would have been happy with any ol' fridge. "We're finding whatever spec is available," said a respondent. "Need to order well in advance and be flexible," advised another.
But the list of shortages was not limited to kitchen appliances. Tile products were a problem for one respondent: "We are having to respecify to domestic manufacturers."
Cabinets were also cited by several repondents. "Unfortunately, playing the waiting game," said a cabinetless respondent.
Another pleaded, "Trying to get locally sourced cabinets, made in the USA." Yet another said, "Diversifying [cabinet] suppliers."
WIDE RANGE OF K+B PRODUCTS STILL MISSING
Other amenities lost in the black hole of the supply chain:
- Vented fans with LED lights
- Porcelain tile
- Faucets
- Stone
- Electrical fixtures
- Plumbing fixtures
- Shower surrounds
- Fiberglass shower units
- Quartz countertops
- Solid surface materials for compartments
- Lighting
- Flooring
The last word on "solving" the K+B amenity shortage problem: "Order way in advance," advised one respondent.
LAST CHANCE TO ENTER FOR $50 GIFT CARD
The survey will close Friday, Oct 7, 2022 at 11:59pm CT, so take the survey now to be eligible for one of 10 $50 gift cards.
(Note: If you've already completed the survey there is no need to repeat it: You are entered in the drawing.)
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
Related Stories
Smart Buildings | Jan 7, 2015
Best practices for urban infill development: Embrace the region's character, master the pedestrian experience
If an urban building isn’t grounded in the local region’s character, it will end up feeling generic and out-of-place. To do urban infill the right way, it’s essential to slow down and pay proper attention to the context of an urban environment, writes GS&P's Joe Bucher.
| Jan 6, 2015
Construction permits exceeded $2 billion in Minneapolis in 2014
Two major projects—a new stadium for the Minnesota Vikings NFL team and the city’s Downtown East redevelopment—accounted for about half of the total worth of the permits issued.
| Jan 2, 2015
Construction put in place enjoyed healthy gains in 2014
Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.
Sponsored | | Dec 30, 2014
Case studies: Engineered wood brings cost savings, design flexibility across commercial project types
For commercial architects facing increasing pressure to design innovative structures while simultaneously cutting costs and accommodating tight deadlines, engineered wood systems are providing a welcome solution.
| Dec 28, 2014
Robots, drones, and printed buildings: The promise of automated construction
Building Teams across the globe are employing advanced robotics to simplify what is inherently a complex, messy process—construction.
| Dec 28, 2014
AIA course: Enhancing interior comfort while improving overall building efficacy
Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.
| Dec 28, 2014
6 trends steering today's college residence halls
University students want more in a residence hall than just a place to sleep. They want a space that reflects their style of living and learning.
| Dec 22, 2014
Studio Gang to design Chicago’s third-tallest skyscraper
The first U.S. real-estate investment by The Wanda Group, owned by China’s richest man, will be an 88-story, 1,148-ft-tall mixed-use tower designed by Jeanne Gang.
| Dec 17, 2014
ULI report looks at growing appeal of micro unit apartments
New research from the Urban Land Institute suggests that micro units have staying power as a housing type that appeals to urban dwellers in high-cost markets who are willing to trade space for improved affordability and proximity to downtown neighborhoods.
| Dec 15, 2014
SHoP Architects plans to turn NY's Seaport District into pedestrianized, mixed-use area
The scheme includes a proposed 500-foot luxury residential tower that would jut out into the harbor, extending the Manhattan grid out into the waterfront.