Early results from MULTIFAMILY Design+Construction's inaugural Kitchen + Bath survey of multifamily developers, architects, contractors, and other specifiers make it clear that supply chain problems are impacting apartment, condo, and townhome projects.
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
HOW COVID, UKRAINE WAR ARE IMPACTING SPECIFIERS
We asked: "What K+B amenities have you had DIFFICULTY SOURCING due to the Covid pandemic or Ukraine war? What are you doing about this?"
Appliances came up more often than any other product category. "We've been purchasing them early and storing in our own warehouses or changing our spec to purchase models that are in stock/available," said one respondent.
"It's been difficult getting appliance packages with the same manufacturer," said another respondent. "We're needing to mix manufacturers and appliances."
Yet another said, of appliances, "We're ordering early and being more flexible, less committed on specific brands or models."
"We had to take early delivery of the appliances (way ahead of schedule), because otherwise they'd be given to another project," said a respondent. "As a result, we had to find storage for the appliances."
Stackable washer/dryer combos were In short supply, according to one respondent.
THE GREAT REFRIGERATOR VANISHING ACT OF 2022
Refrigerators were the main culprit, according to early survey respondents. One respondent was very specific: "French door refrigerators."
But most would have been happy with any ol' fridge. "We're finding whatever spec is available," said a respondent. "Need to order well in advance and be flexible," advised another.
But the list of shortages was not limited to kitchen appliances. Tile products were a problem for one respondent: "We are having to respecify to domestic manufacturers."
Cabinets were also cited by several repondents. "Unfortunately, playing the waiting game," said a cabinetless respondent.
Another pleaded, "Trying to get locally sourced cabinets, made in the USA." Yet another said, "Diversifying [cabinet] suppliers."
WIDE RANGE OF K+B PRODUCTS STILL MISSING
Other amenities lost in the black hole of the supply chain:
- Vented fans with LED lights
- Porcelain tile
- Faucets
- Stone
- Electrical fixtures
- Plumbing fixtures
- Shower surrounds
- Fiberglass shower units
- Quartz countertops
- Solid surface materials for compartments
- Lighting
- Flooring
The last word on "solving" the K+B amenity shortage problem: "Order way in advance," advised one respondent.
LAST CHANCE TO ENTER FOR $50 GIFT CARD
The survey will close Friday, Oct 7, 2022 at 11:59pm CT, so take the survey now to be eligible for one of 10 $50 gift cards.
(Note: If you've already completed the survey there is no need to repeat it: You are entered in the drawing.)
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
Related Stories
Multifamily Housing | Aug 23, 2020
Designing affordable housing on odd urban lots in LA
"Misfit parcels" could be the key to providing more affordable housing in Los Angeles, say two experienced multifamily housing designers.
Multifamily Housing | Aug 16, 2020
TCA Architects specifies Engineered Floors products for 304-unit apartment complex in Tracy, Calif.
TCA Architects specified Lewis Rigid Stone Polymer floating plank and Lewis Gold 100% Solution-Dyed high-performance fiber carpet for Harvest in Tracy, Calif.
Multifamily Housing | Aug 3, 2020
71-unit 100% affordable housing development breaks ground in Mountain View, Calif.
Van Meter Williams Pollack is designing the project.
Multifamily Housing | Aug 2, 2020
Stantec-designed 17 West mixed-use development completed in Miami Beach
Stantec-designed 17 West mixed-use development completed, with first Trader Joe's in Miami Beach.
Multifamily Housing | Jul 31, 2020
Railings manufacturer VistaPro launches its new website
VistaPro Architectural Railing Solutions launches new website.
Multifamily Housing | Jul 29, 2020
Multifamily construction proposal activity sees modest rebound in Q2 2020
Among the firms that work in the multifamily sector, 31% said that proposal activity increased in the second quarter, while 24% said it decreased.
Multifamily Housing | Jul 29, 2020
San Francisco’s Millennium Tower fix approved, moving forward
Simpson Gumpertz & Heger will be the engineer-of-record for the fix.
Multifamily Housing | Jul 27, 2020
Putting 'home' at the heart of affordable housing
Home is a powerful thing. It’s the place that forms you, a guiding set of relationships, memories, and experiences that, for better or worse, make you who you are.
Multifamily Housing | Jul 20, 2020
Abandoned 15-story high-rise becomes mixed-use luxury apartment building
Kimmich Smith Architecture designed the project.