flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABC’s Construction Backlog Indicator rebounds in August

Market Data

ABC’s Construction Backlog Indicator rebounds in August

The primary issue for most contractors is not a lack of demand, but an ongoing and worsening shortage of skilled workers available to meet contractual requirements.


By ABC | October 23, 2019

Associated Builders and Contractors reported today that its Construction Backlog Indicator climbed to nine months in August 2019, up 0.5 months or 5.4% from July 2019, when CBI stood at 8.5 months.

“Despite some other leading indicators suggesting weakening in nonresidential construction spending, our most recent backlog readings show that contractors are still experiencing significant demand for construction services” said ABC Chief Economist Anirban Basu. “The primary issue for most contractors is not a lack of demand, but an ongoing and worsening shortage of skilled workers available to meet contractual requirements. 

“Though this month’s report was generally positive, softening activity in the nation’s manufacturing sector is becoming more apparent in construction data,” said Basu. “Specifically, backlog in the heavy industrial category slipped to 7.7 months in August, a decline of 12%. A number of key manufacturing indicators have been weakening of late, including capacity utilization and the Institute for Supply Management’s index for manufacturing. It appears that the slowdown in factory activity is now being reflected in construction spending data.

“By contrast, backlog for those involved in heavy highway projects or other forms of infrastructure reached 10.4 months, an increase of nearly 13%,” said Basu. “The implication is that state and local governments are leveraging stronger fiscal positions and lower borrowing costs to move forward with more infrastructure projects. Not only is this a source of strength for the U.S. economy, it is helping to support overall nonresidential construction spending. Growing contractual volume in the infrastructure category helped to push backlog among Middle States contractors up to 8.8 months, a 1.8-month gain. Overall, backlog continues to be lengthiest in the South and West.” 

 

 

Related Stories

Market Data | Sep 24, 2020

6 must reads for the AEC industry today: September 24, 2020

SOM's new waterfront neighborhood and a portable restroom designed for mobility.

Market Data | Sep 23, 2020

Architectural billings in August still show little sign of improvement

The pace of decline during August remained at about the same level as in July and June.

Market Data | Sep 23, 2020

7 must reads for the AEC industry today: September 23, 2020

The new Theodore Presidential Library and the AIA/HUD's Secretary's Awards honor affordable, accessible housing.

Market Data | Sep 22, 2020

6 must reads for the AEC industry today: September 22, 2020

Construction employment declined in 39 states and no ease of lumber prices in sight.

Market Data | Sep 21, 2020

Washington is the US state with the most value of construction projects underway, says GlobalData

Of the top 10 largest projects in the Washington state, nine were in the execution stage as of August 2020.

Market Data | Sep 21, 2020

Construction employment declined in 39 states between August 2019 and 2020

31 states and DC added jobs between July and August.

Market Data | Sep 21, 2020

6 must reads for the AEC industry today: September 21, 2020

Four projects receive 202 AIA/ALA Library Building Award and Port San Antonio's new Innovation Center.

Market Data | Sep 18, 2020

Follow up survey of U.S. code officials demonstrates importance of continued investment in virtual capabilities

Existing needs highlight why supporting building and fire prevention departments at the federal, state, and local levels is critical.  

Market Data | Sep 18, 2020

6 must reads for the AEC industry today: September 18, 2020

Sagrada Familia completion date pushed back and energy code appeals could hamper efficiency progress.

Market Data | Sep 17, 2020

6 must reads for the AEC industry today: September 17, 2020

Foster + Partners-designed hospital begins construction in Cairo and heat pumps are the future for hot water.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021