flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABC’s Construction Backlog Indicator rebounds in August

Market Data

ABC’s Construction Backlog Indicator rebounds in August

The primary issue for most contractors is not a lack of demand, but an ongoing and worsening shortage of skilled workers available to meet contractual requirements.


By ABC | October 23, 2019

Associated Builders and Contractors reported today that its Construction Backlog Indicator climbed to nine months in August 2019, up 0.5 months or 5.4% from July 2019, when CBI stood at 8.5 months.

“Despite some other leading indicators suggesting weakening in nonresidential construction spending, our most recent backlog readings show that contractors are still experiencing significant demand for construction services” said ABC Chief Economist Anirban Basu. “The primary issue for most contractors is not a lack of demand, but an ongoing and worsening shortage of skilled workers available to meet contractual requirements. 

“Though this month’s report was generally positive, softening activity in the nation’s manufacturing sector is becoming more apparent in construction data,” said Basu. “Specifically, backlog in the heavy industrial category slipped to 7.7 months in August, a decline of 12%. A number of key manufacturing indicators have been weakening of late, including capacity utilization and the Institute for Supply Management’s index for manufacturing. It appears that the slowdown in factory activity is now being reflected in construction spending data.

“By contrast, backlog for those involved in heavy highway projects or other forms of infrastructure reached 10.4 months, an increase of nearly 13%,” said Basu. “The implication is that state and local governments are leveraging stronger fiscal positions and lower borrowing costs to move forward with more infrastructure projects. Not only is this a source of strength for the U.S. economy, it is helping to support overall nonresidential construction spending. Growing contractual volume in the infrastructure category helped to push backlog among Middle States contractors up to 8.8 months, a 1.8-month gain. Overall, backlog continues to be lengthiest in the South and West.” 

 

 

Related Stories

Market Data | Aug 18, 2020

6 must reads for the AEC industry today: August 18, 2020

The world's first AI-driven facade system and LA's Greek Theatre restoriation completes.

Market Data | Aug 17, 2020

5 must reads for the AEC industry today: August 17, 2020

5 strategies for creating safer hotel experiences and how to manage multifamily assets when residents no longer leave.

Market Data | Aug 14, 2020

6 must reads for the AEC industry today: August 14, 2020

The largest single sloped solar array in the country and renewing the healing role of public parks.

Market Data | Aug 13, 2020

5 must reads for the AEC industry today: August 13, 2020

Apple Central World opens in Bangkok and 7-Eleven to buy Speedway.

Market Data | Aug 12, 2020

6 must reads for the AEC industry today: August 12, 2020

UC Davis's new dining commons and the pandemic is revolutionizing healthcare benefits.

Market Data | Aug 11, 2020

6 must reads for the AEC industry today: August 11, 2020

Elevators can be a 100% touch-free experience and the construction industry adds 20,000 employees in July.

Market Data | Aug 10, 2020

Dodge Momentum Index increases in July

This month’s increase in the Dodge Momentum Index was the first in all of 2020.

Market Data | Aug 10, 2020

Construction industry adds 20,000 employees in July but nonresidential employment dips

Association warns skid will worsen without new relief.

Market Data | Aug 10, 2020

5 must reads for the AEC industry today: August 10, 2020

Private student housing owners reap the benefits as campus housing de-densifies and race for COVID vaccine boosts real estate in life sciences hubs.

Market Data | Aug 7, 2020

6 must reads for the AEC industry today: August 7, 2020

BD+C's 2020 Color Trends Report and HMC releases COVID-19 Campus Reboot Guide for Prek-12 schools.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021