flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Affordable mixed-use housing complex completes in South Los Angeles

Multifamily Housing

Affordable mixed-use housing complex completes in South Los Angeles

KFA designed the project.


By David Malone, Associate Editor | May 12, 2021
Florence Mills Apartments exterior murals

All photos: Jim Simmons Photography

A new 74-unit, mixed-use affordable housing development for families has recently completed at the southwest corner of Central Avenue and Jefferson Boulevard in Los Angeles.

Designed by KFA, The Florence Mills Apartments rises four stories and was designed with a zig-zag plan to create many angles offering views to the street and a sense of openness that celebrates the corner site. Named in honor of Florence Mills, a Black vaudeville singer, dancer, and actress, the project features two large murals of Mills on the outside of the building on prominent street-facing walls.

 

Florence Mills Apartments exterior

 

The project includes 13 one-bedroom units, 37 two-bedroom units, and 24 three-bedroom units. Every unit has a balcony and large windows. Amenities include community and common areas, underground parking, four laundry rooms, and secure access to the building. Additionally, the project features 5,000 sf of commercial retail space that fronts the corner plaza with roll up doors.

 

Florence Mills Exterior facade

 

Units will be restricted to households at the low-, very low-, and extremely low-income levels, with rents set between $507 and $1,171 per month.

The Florence Mills Apartments is expecting to achieve LEED Platinum certification.

 

Florence Mills Apartments mural

Related Stories

Multifamily Housing | May 29, 2020

New multifamily project includes energy storage as an amenity

Each battery is linked to an on-site solar panel array.

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Multifamily Housing | May 8, 2020

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.  

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

Senior Living Design | May 5, 2020

5 memory care communities with a strong sense of mission

Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Multifamily Housing | Apr 20, 2020

Multifamily market flattens as construction proposal activity sinks

Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

Multifamily Housing | Apr 15, 2020

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021