flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA, CSI, and NIBS publish updated national CAD standard, includes new BIM module

AIA, CSI, and NIBS publish updated national CAD standard, includes new BIM module

NCS V6 includes new BIM module, symbols, site/civil language


By NIBS | September 10, 2014

The nation’s leading computer-aided design (CAD) standard has been updated. The American Institute of Architects (AIA), Construction Specifications Institute (CSI) and National Institute of Building Sciences (NIBS) released the newest edition of the United States National CAD Standard (NCS). Version 6 (V6) is available online at the NCSwebsite.

The NCS helps architects, constructors and operators coordinate efforts by classifying electronic design data consistently and making information retrieval easier, the industry groups say. It improves communication among owners and project teams; cuts or eliminates costs of developing and maintaining company-specific standards; and reduces the expense of transferring building data from design applications to facility management applications.

More than 6,000 architectural, engineering and construction (AEC) firms have voluntarily adopted the NCS in their workplaces. For this edition, NCS owners submitted an unprecedented 379 ballot items.

The new edition includes:

• New implementation guidelines on how to successfully implement the NCS for building information modeling (BIM) use.

• An improved style format.

• An enhanced and improved Symbols Library. New “Survey/Mapping” Discipline Designators.

• New Major and Minor Groups definitions added for “Airports and Plumbing.”

• A revised “Module 1 – File Naming” section to better address Model Files and Sheet Files.

• A Revised “Module 4 – Drafting Conventions, 4.2 Drawing Standards” list of common scales to add “Site/Civil” scale descriptions.

• A Revised “Module 4 – Drafting Conventions, 4.3 Sheet Types” section, which includes a new “Floor Numbering” format.

• New and revised “Communications” terms and abbreviations.

• A Revised “Module 7 – Notations, 7.4 User’s Guide” text format for notes.

• A Revised “Plotting Guidelines” introduction.

(http://enews.nibs.org/t/ViewEmail/r/9C609075205ED2982540EF23F30FEDED/228CE72962868167E89F0E32AAFB68BF)

Related Stories

Codes and Standards | Feb 2, 2022

Public works contracting reform advances in New York State

Governor signs bill to form advisory council that will propose policy changes.

Codes and Standards | Feb 2, 2022

Commercial and multifamily construction starts rebounded in 2021

Following COVID uncertainty in 2020, the industry recovered, but still lags 2019 levels.

Codes and Standards | Feb 1, 2022

Biden Administration launches state, local coalition to boost building performance standards

Will focus on energy efficiency and electrification across the buildings sector.

Codes and Standards | Jan 26, 2022

Downtown digital twin to aid Las Vegas in setting policy priorities

Will be used to address energy use, emissions, traffic, parking, noise, and emergency management.

Codes and Standards | Jan 25, 2022

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.

Codes and Standards | Jan 25, 2022

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.

Sponsored | Resiliency | Jan 24, 2022

Norshield Products Fortify Critical NYC Infrastructure

New York City has two very large buildings dedicated to answering the 911 calls of its five boroughs. With more than 11 million emergency calls annually, it makes perfect sense. The second of these buildings, the Public Safety Answering Center II (PSAC II) is located on a nine-acre parcel of land in the Bronx. It’s an imposing 450,000 square-foot structure—a 240-foot-wide by 240-foot-tall cube. The gleaming aluminum cube risesthe equivalent of 24 stories from behind a grassy berm, projecting the unlikely impression that it might actually be floating. Like most visually striking structures, the building has drawn as much scorn as it has admiration. 

Codes and Standards | Jan 24, 2022

N.Y. governor calls for ban on natural gas in new buildings

Action follows New York City’s ban.

Codes and Standards | Jan 19, 2022

EPA may expand product lineup that can earn WaterSense label

Would include systems that enhance water quality at the tap.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021