flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.


By By BD+C Staff | February 7, 2012
This article first appeared in the March 2012 issue of BD+C.

The AIA announced that it has incorporated seven new documents into AIA Documents-on-Demand, bringing the total number of documents available through this service to 86.

The latest addition to Documents-on-Demand includes documents from the A series for Owner/Contractor and the B series for Owner/Architect. Overall, 41 total agreements and forms are now included in Documents-on-Demand that are specifically suited for contractors and three specifically for sub-contractors. AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.

"Documents-on-Demand is a streamlined portal that helps my company access the most important documents we need from AIA Contract Documents," said Shawn Brothers, Contractor at Cronin Construction, Inc. "And, the documents are incredibly easy to use once purchased and downloaded."

AIA Documents-on-Demand is a popular, cost effective, Web-based service that enables both PC and MAC users to easily access, electronically fill out, and print the latest AIA Contract Documents anytime and anywhere with access to the Internet and a printer. Last year, more than 35,000 documents were downloaded through Documents-on-Demand. "Since the relaunch of Documents-on-Demand in 2009, the service has proven incredibly popular and user-friendly as a result of its ease and flexibility," said Molly Lindblom, Managing Director of AIA Contract Documents. "Documents-on-Demand is continuously updated with the latest documents to help meet the changing needs of design and construction industry professionals."

The following documents have been added to AIA Documents-on-Demand:

  1. A151-2007, Standard Form of Agreement Between Owner and Vendor for Furniture, Furnishings and Equipment where the basis of payment is a Stipulated Sum
  2. A251-2007, General Conditions of the Contract for Furniture, Furnishings and Equipment
  3. A751-2007, Invitation and Instructions for Quotation for Furniture, Furnishings and Equipment
  4. B152-2007, Standard Form of Agreement Between Owner and Architect for Architectural Interior Design Services
  5. B153-2007, Standard Form of Agreement Between Owner and Architect for Furniture, Furnishings and Equipment Design Services
  6. B161-2002, Standard Form of Agreement Between Client and Consultant for use where the Project is located outside the United States
  7. B162-2002, Abbreviated Form of Agreement Between Client and Consultant for use where the Project is located outside the United States 

Please visit http://documentsondemand.aia.org.

Related Stories

Adaptive Reuse | Oct 22, 2024

Adaptive reuse project transforms 1840s-era mill building into rental housing

A recently opened multifamily property in Lawrence, Mass., is an adaptive reuse of an 1840s-era mill building. Stone Mill Lofts is one of the first all-electric mixed-income multifamily properties in Massachusetts. The all-electric building meets ambitious modern energy codes and stringent National Park Service historic preservation guidelines.

MFPRO+ News | Oct 22, 2024

Project financing tempers robust demand for multifamily housing

AEC Giants with multifamily practices report that the sector has been struggling over the past year, despite the high demand for housing, especially affordable products.

Performing Arts Centers | Oct 21, 2024

The New Jersey Performing Arts Center breaks ground on $336 million redevelopment of its 12-acre campus

In Newark, N.J., the New Jersey Performing Arts Center (NJPAC) has broken grown on the three-year, $336 million redevelopment of its 12-acre campus. The project will provide downtown Newark 350 mixed-income residential units, along with shops, restaurants, outdoor gathering spaces, and an education and community center with professional rehearsal spaces.

Office Buildings | Oct 21, 2024

3 surprises impacting the return to the office

This blog series exploring Gensler's Workplace Survey shows the top three surprises uncovered in the return to the office.

Healthcare Facilities | Oct 18, 2024

7 design lessons for future-proofing academic medical centers

HOK’s Paul Strohm and Scott Rawlings and Indiana University Health’s Jim Mladucky share strategies for planning and designing academic medical centers that remain impactful for generations to come.

Sports and Recreational Facilities | Oct 17, 2024

In the NIL era, colleges and universities are stepping up their sports facilities game

NIL policies have raised expectations among student-athletes about the quality of sports training and performing facilities, in ways that present new opportunities for AEC firms.

Codes and Standards | Oct 17, 2024

Austin, Texas, adopts AI-driven building permit software

After a successful pilot program, Austin has adopted AI-driven building permit software to speed up the building permitting process.

Resiliency | Oct 17, 2024

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

Seismic Design | Oct 17, 2024

Calif. governor signs limited extension to hospital seismic retrofit mandate

Some California hospitals will have three additional years to comply with the state’s seismic retrofit mandate, after Gov. Gavin Newsom signed a bill extending the 2030 deadline.

MFPRO+ News | Oct 16, 2024

One-third of young adults say hurricanes like Helene and Milton will impact where they choose to live

Nearly one-third of U.S. residents between 18 and 34 years old say they are reconsidering where they want to move after seeing the damage wrought by Hurricane Helene, according to a Redfin report. About 15% of those over age 35 echoed their younger cohort’s sentiment.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021