flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.


By By BD+C Staff | February 7, 2012
This article first appeared in the March 2012 issue of BD+C.

The AIA announced that it has incorporated seven new documents into AIA Documents-on-Demand, bringing the total number of documents available through this service to 86.

The latest addition to Documents-on-Demand includes documents from the A series for Owner/Contractor and the B series for Owner/Architect. Overall, 41 total agreements and forms are now included in Documents-on-Demand that are specifically suited for contractors and three specifically for sub-contractors. AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.

"Documents-on-Demand is a streamlined portal that helps my company access the most important documents we need from AIA Contract Documents," said Shawn Brothers, Contractor at Cronin Construction, Inc. "And, the documents are incredibly easy to use once purchased and downloaded."

AIA Documents-on-Demand is a popular, cost effective, Web-based service that enables both PC and MAC users to easily access, electronically fill out, and print the latest AIA Contract Documents anytime and anywhere with access to the Internet and a printer. Last year, more than 35,000 documents were downloaded through Documents-on-Demand. "Since the relaunch of Documents-on-Demand in 2009, the service has proven incredibly popular and user-friendly as a result of its ease and flexibility," said Molly Lindblom, Managing Director of AIA Contract Documents. "Documents-on-Demand is continuously updated with the latest documents to help meet the changing needs of design and construction industry professionals."

The following documents have been added to AIA Documents-on-Demand:

  1. A151-2007, Standard Form of Agreement Between Owner and Vendor for Furniture, Furnishings and Equipment where the basis of payment is a Stipulated Sum
  2. A251-2007, General Conditions of the Contract for Furniture, Furnishings and Equipment
  3. A751-2007, Invitation and Instructions for Quotation for Furniture, Furnishings and Equipment
  4. B152-2007, Standard Form of Agreement Between Owner and Architect for Architectural Interior Design Services
  5. B153-2007, Standard Form of Agreement Between Owner and Architect for Furniture, Furnishings and Equipment Design Services
  6. B161-2002, Standard Form of Agreement Between Client and Consultant for use where the Project is located outside the United States
  7. B162-2002, Abbreviated Form of Agreement Between Client and Consultant for use where the Project is located outside the United States 

Please visit http://documentsondemand.aia.org.

Related Stories

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021