flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AIA launches education and training portal

AIA launches education and training portal

New portal to host Contract Documents training, education resources in one convenient place.


By Posted by Tim Gregorski, Senior Editor | May 11, 2012
This article first appeared in the June 2012 issue of BD+C.

The AIA launched its Contract Documents Education Portal, aia.org/docucation, a comprehensive, user-friendly web site that offers contractors, builders, and architects high-quality Contract Documents-related education programs and materials in one convenient online location.

Users of the new site can access live training webinars, podcasts, and on-demand courses, some eligible for continuing education credit, as well as an extensive library of written resources such as comparisons of old and new AIA Contract Documents and commentaries to better understand key terms and clauses of AIA Contract Documents.

Additionally, aia.org/docucation visitors can access over 500 frequently asked questions about using AIA documents, guides – available as free downloads – on methods in design and construction projects, and register for in-person events and audience-centered and dialogue friendly workshops and discussions groups.

Led by experts in their fields, current courses offerings include:

  • Sustainable Design and Construction: Identifying, Understanding, and Addressing, the Key Issues
  • An overview of the recently released green model building code, the International Green Construction Code (IcCC)
  • New federal regulations on implementation of the ADA guidelines and the relevant issues facing accessible design
  • Owner/Contractor Agreements and Choosing the Right One for A Project
  • Payment Applications and Change Orders
  • Docs 101: Introduction to Construction Contracts for Small Firms
  • Contract Documents for Digital Practice, and
  • Managing Risk: Using Owner/Contractor and Subcontractor Construction Contracts. +

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021