The American Institute of Architects (AIA) is releasing updated contract documents today, including two key residential contracts and a complimentary Condominium Project Guide.
Revised residential contract documents address insurance requirements, post-occupancy site visits and maintenance requirements. The updated B109™-2020, Standard Form of Agreement Between Owner and Architect for a Multi-Family Residential or Mixed Use Residential Project now includes a new, optional limitation of liability. While incorporating the aspects of the new B109, the free Condominium Projects Guide includes model language pertaining to the homeowners association, the individual unit owners, by-laws, and purchase agreements.
“Although the B109 is designed for multi-family residential projects, it specifically includes a representation by the owner that the project will not include a residential condominium,” said AIA Contract Documents Manager and Counsel James R. Germano, Esq. “Parties wishing to convert the B109 for use on a residential condominium project will find the Condominium Projects Guide helpful.”
For residential development, the updated B107™-2020, Standard Form of Agreement Between Developer-Builder and Architect for Prototype(s) for a One or Two Single Family Residential Project with Limited Architectural Services incorporates updated language from the B101, Owner/Architect Agreement. The B107 is specifically designed to allow a developer-builder to hire an architect to design prototype houses, the design of which can be repeatedly used by the developer-builder. The architect is expected to develop the design of each prototype to a level minimally required to achieve a building permit. Meanwhile, the developer-builder is expected to be an entity who is knowledgeable about residential construction who can then take this “Permit Set” of drawings and complete the project.
AIA will provide a free webinar to learn more about the key residential documents’ updates from 1-2 p.m. EST, on Monday, Nov. 2. Registration is required.
Other new and revised documents being released are:
A305™-2020, Contractor’s Qualification Statement
The updated A305 allows contractors to express additional capabilities such as safety protocols and plans, sustainability services as well as BIM experience. A305 can also now be assembled in a modular fashion. Contractors can use it to provide general information about their company, sensitive financial and performance information, and information that pertains to a specific project.
Learn more
A313™-2020, Warranty Bond
The AIA worked closely with both the National Association of Surety Bond Producers (NASBP) and the Surety & Fidelity Association of America (SFAA) to develop the new warranty bond, which provides coverage for the contractor’s post-completion warranty obligations when a traditional performance bond may cease to provide coverage. This new bond is a useful tool to owners and contractors who wish to navigate the post-completion warranty obligation process more successfully, particularly on complex projects.
Learn more
B106™-2020, Standard Form of Agreement Between Owner and Architect for Pro Bono Services
The free pro bono agreement has been updated to include the 2017 core AIA document changes as well as clauses that help architects providing pro bono services mitigate the risk of such activities, including clauses that address indemnity and limitation of liability.
Learn more
AIA documents can be purchased with an unlimited-use annual license or as a single, customizable document. AIA contract documents are also available as single, non-editable documents and as paper versions through some AIA chapters. Visit aiacontracts.org for more information.
Related Stories
Market Data | Sep 2, 2020
Coronavirus has caused significant construction project delays and cancellations
Yet demand for skilled labor is high, new survey finds.
Market Data | Sep 2, 2020
5 must reads for the AEC industry today: September 2, 2020
Precast concrete tower honors United AIrlines Flight 93 victims and public and private nonresidential construction spending slumps.
Market Data | Sep 2, 2020
Public and private nonresidential construction spending slumps in July
Industry employment declines from July 2019 in two-thirds of metros.
Market Data | Aug 31, 2020
5 must reads for the AEC industry today: August 31, 2020
The world's first LEED Platinum integrated campus and reopening campus performance arts centers.
Market Data | Aug 21, 2020
5 must reads for the AEC industry today: August 21, 2020
Student housing in the COVID-19 era and wariness of elevators may stymie office reopening.
Market Data | Aug 20, 2020
6 must reads for the AEC industry today: August 20, 2020
Japan takes on the public restroom and a look at the evolution of retail.
Market Data | Aug 19, 2020
6 must reads for the AEC industry today: August 19, 2020
July architectural billings remained stalled and Florida becomes third state to adopt concrete repair code.
Market Data | Aug 18, 2020
July architectural billings remained stalled
Clients showed reluctance to sign contracts for new design projects during July.
Market Data | Aug 18, 2020
Nonresidential construction industry won’t start growing again until next year’s third quarter
But labor and materials costs are already coming down, according to latest JLL report.
Market Data | Aug 18, 2020
6 must reads for the AEC industry today: August 18, 2020
The world's first AI-driven facade system and LA's Greek Theatre restoriation completes.