The American Institute of Architects (AIA) is releasing updated contract documents today, including two key residential contracts and a complimentary Condominium Project Guide.
Revised residential contract documents address insurance requirements, post-occupancy site visits and maintenance requirements. The updated B109™-2020, Standard Form of Agreement Between Owner and Architect for a Multi-Family Residential or Mixed Use Residential Project now includes a new, optional limitation of liability. While incorporating the aspects of the new B109, the free Condominium Projects Guide includes model language pertaining to the homeowners association, the individual unit owners, by-laws, and purchase agreements.
“Although the B109 is designed for multi-family residential projects, it specifically includes a representation by the owner that the project will not include a residential condominium,” said AIA Contract Documents Manager and Counsel James R. Germano, Esq. “Parties wishing to convert the B109 for use on a residential condominium project will find the Condominium Projects Guide helpful.”
For residential development, the updated B107™-2020, Standard Form of Agreement Between Developer-Builder and Architect for Prototype(s) for a One or Two Single Family Residential Project with Limited Architectural Services incorporates updated language from the B101, Owner/Architect Agreement. The B107 is specifically designed to allow a developer-builder to hire an architect to design prototype houses, the design of which can be repeatedly used by the developer-builder. The architect is expected to develop the design of each prototype to a level minimally required to achieve a building permit. Meanwhile, the developer-builder is expected to be an entity who is knowledgeable about residential construction who can then take this “Permit Set” of drawings and complete the project.
AIA will provide a free webinar to learn more about the key residential documents’ updates from 1-2 p.m. EST, on Monday, Nov. 2. Registration is required.
Other new and revised documents being released are:
A305™-2020, Contractor’s Qualification Statement
The updated A305 allows contractors to express additional capabilities such as safety protocols and plans, sustainability services as well as BIM experience. A305 can also now be assembled in a modular fashion. Contractors can use it to provide general information about their company, sensitive financial and performance information, and information that pertains to a specific project.
Learn more
A313™-2020, Warranty Bond
The AIA worked closely with both the National Association of Surety Bond Producers (NASBP) and the Surety & Fidelity Association of America (SFAA) to develop the new warranty bond, which provides coverage for the contractor’s post-completion warranty obligations when a traditional performance bond may cease to provide coverage. This new bond is a useful tool to owners and contractors who wish to navigate the post-completion warranty obligation process more successfully, particularly on complex projects.
Learn more
B106™-2020, Standard Form of Agreement Between Owner and Architect for Pro Bono Services
The free pro bono agreement has been updated to include the 2017 core AIA document changes as well as clauses that help architects providing pro bono services mitigate the risk of such activities, including clauses that address indemnity and limitation of liability.
Learn more
AIA documents can be purchased with an unlimited-use annual license or as a single, customizable document. AIA contract documents are also available as single, non-editable documents and as paper versions through some AIA chapters. Visit aiacontracts.org for more information.
Related Stories
Market Data | May 11, 2020
6 must reads for the AEC industry today: May 11, 2020
Nashville residential tower will rise 416 feet and the construction industry loses 975,000 jobs.
Market Data | May 8, 2020
Construction industry loses 975,000 jobs in April as new association survey shows deteriorating demand for construction projects
Association partner Procore also releases near real-time construction data measuring impacts of coronavirus as association calls for new measures.
Market Data | May 8, 2020
7 must reads for the AEC industry today: May 8, 2020
The death of the office and Colorado's first multifamily project to receive WELL Precertification.
Market Data | May 7, 2020
5 must reads for the AEC industry today: May 7, 2020
5 memory care communities with a strong sense of mission and making jobsites safer in the COVID-19 world.
Market Data | May 6, 2020
6 must reads for the AEC industry today: May 6, 2020
5 questions engineers will ask after COVID-19 and coronavirus threatens push for denser housing.
Market Data | May 5, 2020
5 must reads for the AEC industry today: May 5, 2020
A new temporary hospital pops up in N.J., and apartment firms' reactivation plans begin to take shape.
Market Data | May 4, 2020
6 must reads for the AEC industry today: May 4, 2020
How working from home is influencing design and is this the end of the open office?
Market Data | May 4, 2020
The Los Angeles market continue to lead the U.S. hotel construction pipeline at the close of the first quarter of 2020
Nationally, under construction project counts hit a new all-time high with 1,819 projects with 243,100 rooms.
Market Data | May 1, 2020
Nonresidential construction spending declines in March as pandemic halts projects
Group warns loan threats are hurting relief program.
Market Data | May 1, 2020
6 must reads for the AEC industry today: May 1, 2020
DLR Group completes LA Memorial Coliseum renovation and over 50% of department stores in malls predicted to close by 2021.