flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

AISC, AIA release second part of design assist guidelines for the structural steel industry

Codes and Standards

AISC, AIA release second part of design assist guidelines for the structural steel industry

The guidelines are focused on design assist for fabricated structural steel projects. 


By Peter Fabris, Contributing Editor  | February 20, 2024
AISC, AIA release second part of design assist guidelines for the structural steel industry
The document describes the roles and responsibilities of various project participants and provides general guidelines about applying those strategies to fabricated structural steel projects. Image courtesy AISC

The American Institute of Steel Construction and AIA Contract Documents have released the second part of a document intended to provide guidance for three common collaboration strategies.

The document, Design Assist: Collaborative Design Approach Guidelines for the Fabricated Structural Steel Industry, is a follow-up to part one, Delegated Design, Design Assist, and Informal Involvement: What does it all mean?

The strategies covered are informal involvement, design assist, and delegated design. Part II focuses on the implementation of design assist in the fabricated structural steel industry. The document describes the roles and responsibilities of various project participants and provides general guidelines about applying those strategies to fabricated structural steel projects.

“Great teams drive great projects—and great teams rely on clear communication,” said Babette Freund, vice president of special projects, Dave Steel Company, Inc., and chair of AISC’s Code of Standard Practice Committee. “This paper aims to help project teams use design assist strategies to meet a defined project schedule and budget while minimizing the costs and disruptions that might arise from team misalignments.”

How AISC defines design assist for the structural steel industry

According to the guidelines, design assist is, "A form of collaboration where a structural steel fabricator and/or erector (or a fabricator/erector team under one contract, depending on project circumstances) provides information under a contract with the owner or other party as designated by the owner, to assist a structural engineer of record (SER) and other designated members of the design assist team with the design of the structural steel for buildings or building-like structures." 

Related Stories

| Oct 9, 2014

Seattle puts restrictions on micro apartments

The Seattle City Council passed new rules that new studio apartments in the city must measure at least 220 sf and contain at least two sinks.

| Oct 9, 2014

Cities get creative with stormwater management

Cities around the world are crafting stormwater management policies that include natural and manmade methods to store and absorb runoff to reduce flooding.

| Oct 2, 2014

Fannie Mae study says affordable rental units more energy efficient than market-rate units

Fannie Mae’s new report on energy usage in the multifamily sector found that affordable properties use 28% less energy per unit and are 29% smaller than market-rate properties.

| Oct 2, 2014

California Energy Commission launches code upgrade process

The California Energy Commission launched the upgrade process to Title 24, the state energy code, last month.

| Oct 2, 2014

Canals to mitigate flooding could be in Boston’s future

The Urban Land Institute held brainstorming sessions over the last several months involving more than 70 engineers, architects, and development and insurance specialists to examine how rising sea levels would affect four representative areas in and around Boston.

| Oct 2, 2014

Los Angeles reverses ban on high-rise slanted roofs and spires

Los Angeles reversed course last month on a regulation that had barred skyscrapers from having slanted roofs or spires.

| Sep 29, 2014

10 common deficiencies in aging healthcare facilities

VOA's Douglas King pinpoints the top issues that arise during healthcare facilities assessments, including missing fire/smoke dampers, out-of-place fire alarms, and poorly constructed doorways. 

| Sep 29, 2014

Report finds links between office design, health and productivity

A new report from the World Green Building Council finds “overwhelming evidence” to support office design as a significant influencer of the health, wellbeing and productivity of staff.

| Sep 29, 2014

San Francisco office tower is first U.S. building to earn LEED Platinum v4 certification

One Sansome Street, San Francisco is the first building in the U.S. to achieve LEED Platinum v4 certification. The building is also only the second property worldwide to be awarded with v4 certification.

| Sep 29, 2014

Navy to begin BIM phased implementation in October

The U.S. Naval Facilities Engineering Command will begin its Building Information Management and Modeling (BIM) Phased Implementation Plan in October.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021