flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Almost Home Kids opens third residence in Illinois for children with health complexities

Healthcare Facilities

Almost Home Kids opens third residence in Illinois for children with health complexities

Its newest location is positioned as a prototype for national growth.


By John Caulfield, Senior Editor | December 12, 2018

The 22,000-sf, 12-bedroom Almost Home Kids facility in Peoria, Ill., provides transitional care for children with complicated health conditions. Images: Ballogg Photography

Children with medically complex conditions represent an estimated three million children who account for 40% of Medicaid spending on children. Growing at 6% annually, they are among the most rapidly growing sectors of the pediatric population.

As hospitals struggle to manage costs and resources, moving children with such maladies through a continuum of care is critical to meeting the clinical, social, and emotional needs of this population and their families.

There are over 14,000 children with medical complexities in Illinois alone, where, in late October, Almost Home Kids—an organization that provides transitional care in home-like settings for children with complex medical needs, as well as training and respite care for their families—opened its third location in the country, on the Peoria campus of OSF Healthcare Children’s Hospital of Illinois, the state’s third-largest pediatric hospital.

Almost Home Kids also operates 12-bedroom houses facilities in Naperville, Ill., and Chicago. The three facilities were funded entirely by community and business donations.

Stantec assisted in the design, medical planning, and interiors of the 22,000-sf Almost Home Kids in Peoria, which is the first implementation of the organization’s national prototype. Stantec worked with a panel of Almost Home Kids clinicians and families during the design and site adaptation processes.

 

Almost Home Kids provides training to help families care for their sick chlidren. Image: Ballogg Photography

 

“This is much more than just a project for us,” says Rebel Roberts, FAIA, RIBA, FACHA, Practice Leader for Design at Stantec. “It’s a positive healing space and a comforting home where families feel relieved and welcome. We hope this prototype continues to get adopted and we see more Almost Home Kids facilities throughout the country, because they truly are remarkable.”

In an interview with BD+C, Roberts elaborates that neither of Almost Home Kids’ first two facilities—a renovated house in Naperville and a midrise build-to-suit within a relatively tall building in downtown Chicago—was a suitable model for expansion into other cities. The Peoria house, on the other hand, is a ground-up, freestanding unit, for which Stantec did mockups and drawings. The plan is scalable, says Roberts, and can be attuned to a market’s local climate.

Children at the Almost Home Kids at OSF HealthCare Children’s Hospital of Illinois receive 24-hour medical and nursing support from skilled pediatric nurses. The organization helps train family members to provide the best care for their children, including how to operate and maintain the child’s home medical equipment, prepare medications and treatments, and maximize government support systems such as home modifications and/or obtaining home nursing hours.

The organization’s website states that it took “several years of planning, collaboration, and construction” with the hospital to complete the $8.5 million Peoria facility, whose general contractor was Core Construction and engineer was IMEG. Almost Home Kids has stated previously its intention to expand nationally and open new facilities across the country, but has not disclosed its timetable or proposed locations.

Related Stories

Healthcare Facilities | Sep 29, 2017

Having a vision

The ability to clearly communicate specific priorities to your team is among the most important tasks the owner’s leadership team will perform.

Healthcare Facilities | Sep 21, 2017

Boat dealership becomes Tempe’s newest health clinic

The new space was designed with community input to be used by patients and non-patients alike.

Healthcare Facilities | Sep 19, 2017

Small UCHealth hospital in Longmont, Colo., designed with ability to grow over time

UCHealth Longs Peak Hospital opened for first patient on August 31.

Laboratories | Sep 12, 2017

New York City is positioning itself as a life sciences hub

A new Transwestern report highlights favorable market and regulatory changes.

Healthcare Facilities | Sep 5, 2017

Home away from home: Children’s hospitals that soothe, support, and distract

Building Teams help children’s hospitals create a sense of normalcy for patients and their families.

Healthcare Facilities | Sep 1, 2017

Caring for caregivers

Many healthcare organizations are increasingly focused on designing amenities, policies, and workplaces to better support their clinicians, health providers, and administrators.

Healthcare Facilities | Aug 30, 2017

Proactively addressing population health while improving access to care

The Golisano Center for Community Health offers integrated care to adults and children.

Giants 400 | Aug 29, 2017

Top 110 healthcare construction firms

Turner, McCarthy, and Skanska top BD+C’s ranking of the nation’s largest healthcare sector contractor and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Aug 29, 2017

Top 80 healthcare engineering firms

WSP, AECOM, and KJWW top BD+C’s ranking of the nation’s largest healthcare sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Aug 29, 2017

Top 125 healthcare architecture firms

HDR, HKS, and Perkins+Will top BD+C’s ranking of the nation’s largest healthcare sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021