flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The American National Standards Institute accredits Stantec for greenhouse gas verification

The American National Standards Institute accredits Stantec for greenhouse gas verification


March 22, 2011

EDMONTON, AB (March 22, 2011) TSX, NYSE: STN Stantec Consulting Ltd.’s Atmospheric Environment Group has been awarded accreditation by the American National Standards Institute (ANSI) for verification of assertions related to greenhouse gas (GHG) emissions (Accreditation #0805). The Scope of Accreditation is for verification of emissions and removals at the organizational level for Group 1 – General.

Stantec Consulting Ltd. is one of only 22 companies in North America that are currently ANSI accredited. ANSI’s accreditation under ISO 14065 provides an independent assessment of competence and conformance with internationally recognized environmental standards.

Stantec’s current accreditation is applicable to corporate reporters seeking verification of their GHG inventories and the firm expects to expand its accreditation to scopes that cover other programs and registries associated with ANSI. Accreditation provides confidence to industries, regulators, and investors who rely on GHG assertions or claims that the verifiers are competent, have systems in place to manage impartiality, and can provide the required level of assistance on a consistent basis.

ANSI’s GHG accreditation program is applicable to a broad spectrum of industries that require third-party verification of their GHG assertions to the following programs and registries, among others.

  • Pacific Carbon Trust
  • American Carbon Registry
  • CarbonFix
  • Climate Action Reserve
  • The Climate Registry
  • Verified Carbon Standard

The rigorous accreditation process involved a review of Stantec’s staff qualifications, project experience, quality control systems, and adherence to ISO standards. It also included on-site assessments and a field assessment of a verification of a GHG inventory. “Hundreds of organizations report their GHG emissions to established bodies such as The Climate Registry. We can now easily assist them in meeting stringent third- party verification requirements,” says Dr. Mike Murphy, leader of Stantec’s Atmospheric Environment Group.

Stantec has assembled one of North America’s most experienced climate services teams, comprised of scientists, engineers, planners, business strategists, and environmental market specialists who have worked on hundreds of climate and GHG related projects.

Services include GHG emissions benchmarking, management, planning, and verification; carbon footprint evaluations of facilities, operations and distribution/transportation networks; risk and vulnerability assessments; carbon market analysis and offsets; life cycle and embedded carbon assessment of products and supply chains; climate change policy formulation; and carbon sequestration support.

Stantec provides professional consulting services in planning, engineering, architecture, interior design, landscape architecture, surveying, environmental sciences, project management, and project economics for infrastructure and facilities projects. We support public and private sector clients in a diverse range of markets, at every stage, from initial concept and financial feasibility to project completion and beyond. Our services are offered through approximately 10,500 employees operating out of more than 160 locations in North America.

Related Stories

| Dec 17, 2010

Luxury condos built for privacy

A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.

| Dec 17, 2010

Subway entrance designed to exude Hollywood charm

The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021