flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The American National Standards Institute accredits Stantec for greenhouse gas verification

The American National Standards Institute accredits Stantec for greenhouse gas verification


March 22, 2011

EDMONTON, AB (March 22, 2011) TSX, NYSE: STN Stantec Consulting Ltd.’s Atmospheric Environment Group has been awarded accreditation by the American National Standards Institute (ANSI) for verification of assertions related to greenhouse gas (GHG) emissions (Accreditation #0805). The Scope of Accreditation is for verification of emissions and removals at the organizational level for Group 1 – General.

Stantec Consulting Ltd. is one of only 22 companies in North America that are currently ANSI accredited. ANSI’s accreditation under ISO 14065 provides an independent assessment of competence and conformance with internationally recognized environmental standards.

Stantec’s current accreditation is applicable to corporate reporters seeking verification of their GHG inventories and the firm expects to expand its accreditation to scopes that cover other programs and registries associated with ANSI. Accreditation provides confidence to industries, regulators, and investors who rely on GHG assertions or claims that the verifiers are competent, have systems in place to manage impartiality, and can provide the required level of assistance on a consistent basis.

ANSI’s GHG accreditation program is applicable to a broad spectrum of industries that require third-party verification of their GHG assertions to the following programs and registries, among others.

  • Pacific Carbon Trust
  • American Carbon Registry
  • CarbonFix
  • Climate Action Reserve
  • The Climate Registry
  • Verified Carbon Standard

The rigorous accreditation process involved a review of Stantec’s staff qualifications, project experience, quality control systems, and adherence to ISO standards. It also included on-site assessments and a field assessment of a verification of a GHG inventory. “Hundreds of organizations report their GHG emissions to established bodies such as The Climate Registry. We can now easily assist them in meeting stringent third- party verification requirements,” says Dr. Mike Murphy, leader of Stantec’s Atmospheric Environment Group.

Stantec has assembled one of North America’s most experienced climate services teams, comprised of scientists, engineers, planners, business strategists, and environmental market specialists who have worked on hundreds of climate and GHG related projects.

Services include GHG emissions benchmarking, management, planning, and verification; carbon footprint evaluations of facilities, operations and distribution/transportation networks; risk and vulnerability assessments; carbon market analysis and offsets; life cycle and embedded carbon assessment of products and supply chains; climate change policy formulation; and carbon sequestration support.

Stantec provides professional consulting services in planning, engineering, architecture, interior design, landscape architecture, surveying, environmental sciences, project management, and project economics for infrastructure and facilities projects. We support public and private sector clients in a diverse range of markets, at every stage, from initial concept and financial feasibility to project completion and beyond. Our services are offered through approximately 10,500 employees operating out of more than 160 locations in North America.

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021