flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The American Psychiatric Association moves into The Wharf

Office Buildings

The American Psychiatric Association moves into The Wharf

The new office occupies 3 floors at 800 Main Avenue SW.


By David Malone, Associate Editor | February 8, 2018
Conference room and office space at the APA's new office
Conference room and office space at the APA's new office

The American Psychiatric Association (APA) recently moved into its new flagship office at The Wharf, 800 Main Avenue SW in Washington, D.C. The OTJ Architects-designed space will occupy 63,000 sf across the building’s 9th, 10th, and 11th floors.

Two of the more unique elements of the space are a two-story glass staircase that connects the 10th and 11th floors and a large lounge that is contiguous to the main conference room that can accommodate all 200 staff. Additionally, a glass-walled boardroom uses a state-of-the-art audio/visual system and two conjoined “eyebrow-shaped” tables that can seat up to 30 people with unobstructed sightlines.

 

The APA's new officeCourtesy of OTJ Architects.

 

The office was designed to be modern, open, and collaborative. “We have included many collaborative spaces, as well as individual offices and expansive meeting areas,” says OTJ Associate Preeti Reddy, NCIDQ, IIDA, in a release. “The floorplan has also been designed to ensure everyone is able to enjoy the inspiring vistas of the Capitol Building, Jefferson Memorial and, of course, the Potomac River.”

OTJ designed the office to meet LEED Gold Certification standards and also incorporated WELL Building Standard strategies. The APA moved into the new space in December 2017.

Related Stories

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 17, 2011

Hollister Construction Services renovating bank in Union City, N.J.

Project is part of a series of ground-up construction and renovation assignments.

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group

Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design. 

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021