flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

American Wood Council updates free Connection Calculator

Codes and Standards

American Wood Council updates free Connection Calculator

Tool includes cross-laminated timber connection provisions and post-frame ring shank nails.


By Peter Fabris, Contributing Editor | September 20, 2019

The American Wood Council (AWC) has released an updated version of its free Connection Calculator.

The tool is based on the provisions the National Design Specification (NDS) for Wood Construction that is referenced in the 2015 International Building Code. The updated calculator includes cross-laminated timber (CLT) connection provisions and post-frame ring shank nails.

The tool provides an app-based approach for calculating capacities for single bolts, nails, lag screws, and wood screws. It offers a convenient way to determine both lateral and withdrawal connection values, and includes adjustment factors for temperature, wet service, varying load durations, and end grain.

Single- and double-shear capacities can be determined, as well as wood-to-wood, wood-to-concrete, and wood-to-steel connections, using a variety of solid sawn lumber, glulam, and CLT species, and wood structural panels. For connections loaded in shear, the calculator presents results for each of the NDS-prescribed yield modes and calls out the controlling result.

Related Stories

| Apr 19, 2012

Michigan legislature tackling controversial rules on electricians

A fight is brewing in the Michigan legislature over how many fully qualified electricians must be present during electrical work when apprentices also are on hand.

| Apr 19, 2012

Washington city may base building code on rising sea level due to global warming

Aberdeen may become the first city in Washington to base a building code on rising oceans and global warming.

| Apr 19, 2012

CSI webinar on energy codes and building envelopes

This seminar will review recent changes in energy codes, examples of building enclosure wall assemblies for code compliance, potential moisture management and durability challenges, and design tools to assess and minimize potential problems.

| Apr 19, 2012

Innovative plan for storm water in Philadelphia gets EPA’s OK

Philadelphia's $2 billion plan to manage its storm water with green methods including porous pavement, green roofs, and more trees, was officially approved last week by the U.S. Environmental Protection Agency.

| Apr 19, 2012

LEED 2012 to include new credit category for transit-oriented development

The updated LEED 2012 system will introduce a new credit category, “Location and Transportation,” to encourage development oriented around public transit and more walkable communities.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

| Apr 13, 2012

Congress’s action doesn’t mean Pentagon can’t build LEED gold structures

Though Congress passed a defense budget preventing the Department of Defense from spending money to achieve LEED gold or platinum certification, the Pentagon may still end up constructing buildings to those standards.

| Apr 13, 2012

International Living Building Institute certifies first two Net Zero Energy buildings

A community building in Oregon and an office building in California are the first two projects to earn net-zero status under the International Living Building Institute’s Net Zero Energy Certification program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021