flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Andres Caballero Appointed President of Uponor North America

Building Team

Andres Caballero Appointed President of Uponor North America

He will be based in Apple Valley, Minn., reporting to Michael Rauterkus, president and CEO, Uponor Corporation.


By Andres Caballero | June 20, 2022
Andres Caballero Uponor President
Courtesy Uponor.

Uponor Corporation (Uponor) has named Andres Caballero president of its Building Solutions – North America division and a member of the Executive Committee at Uponor. He will be based in Apple Valley, Minn., reporting to Michael Rauterkus, president and CEO, Uponor Corporation.

Andres has extensive leadership experience, including more than a decade at Honeywell International Inc., leading global businesses in Environmental and Control Solutions, Building Solutions, Honeywell Homes, and Sensing and Control. Prior to joining Honeywell, Andres led the Americas business for the Topcon-Danfoss joint venture and led the Latin America business for the Danfoss Mobile Electronics division. More recently, Andres has founded and run three businesses active in management consulting, AI technology, and music.

“I am delighted to welcome Andres to Uponor,” says Rauterkus. “He is a leader with a strong customer and commercial focus and has broad international experience in the manufacturing industry. His entrepreneurial spirit and proven track record in growing businesses will be important in taking our Uponor North America operation to the next level, while also expanding the company’s leadership position through new channels and new offerings.”

“I am honored to join a leading organization like Uponor,” says Caballero. “I am excited by the company’s growth strategy, tradition of innovation, and people-first culture. I look forward to working with the Executive Committee and the North American leadership team to continue accelerating the growth of the company.” 

Related Stories

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021