flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Another new industrial facility breaks ground in hottest market for this sector

Industrial Facilities

Another new industrial facility breaks ground in hottest market for this sector

The Brickyards on Ellsworth in Mesa, Ariz., will eventually have eight buildings.


By John Caulfield, Senior Editor | May 9, 2024
Rendering of Brickyards on Ellsworth
The Brickyards on Ellsworth will be located in an Opportunity Zone in Mesa, Ariz. Image credit: Martens Development

Scottsdale, Ariz.-based Martens Development recently broke ground on The Brickyards on Ellsworth, an eight-building, 909,553-sf Class A industrial facility development in Mesa.

A construction team led by FCL Builders will deliver move-in-ready spaces for what is one of the more active industrial submarkets in the U.S. Ware Malcomb designed the buildings that will range in size from 35,000 to 250,000 sf. The building team includes Hunter Engineering and TLCP (SE), and Peterson Associates (MEP). CBRE is managing the leasing.

Also see: How big-ticket, government-funded investments in industrial developments are affecting private construction companies

Martens has been developing projects in Mesa for eight years, according to its Principal David Martens. “A lot of businesses are coming from California, Oregon, Washington, Utah … because we have a friendly business environment.” One of the developer’s recent projects is The Landing, a 10-building complex that was completed in 2022.

Phoenix leads in industrial facility building

 

The Brickyards of Ellsworth will offer numerous build-to-suit options for tenants. 

According to CommercialEdge data, Phoenix is the most active industrial construction market in the country, with 42.7 million sf underway, representing 11.1 percent of that market’s stock. As of the third quarter of 2023, more than 15 million sf of industrial space were under construction in Southeast Mesa, according to reporting by the Phoenix Business Journal.

The 63-acre Brickyards on Ellsworth, with an estimated price tag of $153.6 million, is located near the Phoenix-Mesa Gateway Airport within the Pecos Advanced Manufacturing Zone and near the SRP 69kV transmission line. That proximity ensures ample available power to tenants, according to city officials. The development is also in a designated Foreign Trading Zone that reduces or defers tariffs and duties on products produced in the zone, and could also reduce qualified users’ property taxes.

The Brickyards on Ellsworth will offer a mix of specification and build-to-suit options, with each building featuring about 10 percent office space. When The Brickyards on Ellsworth is completed in the summer of 2025, Martens Development’s industrial portfolio will exceed 5 million sf. (While the eighth building in the Brickyards on Ellsworth complex is planned, there’s no timeline yet on when it will be started.)

Related Stories

| Aug 22, 2013

Warehouse remake: Conversion project turns derelict freight terminal into modern office space [slideshow]

The goal of the Freight development is to attract businesses to an abandoned industrial zone north of downtown Denver.

| Aug 20, 2013

As costs rise, Building Teams turn to novel energy-saving schemes for data centers [2013 Giants 300 Report]

Shrinking IT budgets and rising operational costs have led data center operators and corporate clients to scrutinize project budgets. As a result, AEC firms are being tasked with finding solutions for lowering the overall cost of computing and operating and maintaining the facilities. 

| Aug 20, 2013

Top Data Center Construction Firms [2013 Giants 300 Report]

DPR, Balfour Beatty, Holder head Building Design+Construction's 2013 ranking of the largest data center contractors and construction management firms in the U.S.

| Aug 20, 2013

Top Data Center Engineering Firms [2013 Giants 300 Report]

Fluor, Syska, Jacobs top Building Design+Construction's 2013 ranking of the largest data center engineering and engineering/architecture firms in the U.S.

| Aug 20, 2013

Top Data Center Architecture Firms [2013 Giants 300 Report]

Corgan, Gensler, HDR head Building Design+Construction's 2013 ranking of the largest data center architecture and architecture/engineering firms in the U.S.

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 18, 2013

Top Local Government Sector Construction Firms [2013 Giants 300 Report]

Turner, Clark Group, PCL top Building Design+Construction's 2013 ranking of the largest local government sector contractor and construction management firms in the U.S.

| Jul 18, 2013

Top Local Government Sector Engineering Firms [2013 Giants 300 Report]

STV, URS, AECOM top Building Design+Construction's 2013 ranking of the largest local government sector engineering and engineering/architecture firms in the U.S. 

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021