The Garage, an adaptive reuse project in New Orleans, comprises 62 residential units across 154,000-sf. The project also includes 20,900 sf of retail space on the main level.
Built from what was once a 1950’s car dealership and its integrated parking structure, The Garage features amenities such as a rooftop pool and lounge, equipped with a 24/7 fitness center; roll-up garage doors in the units that separate the bedrooms from the rest of the living space; and two fully automated, class-B freight elevators that allow residents to self-park next to their residence.
Photo: David Armentor.
An overhead monitor directs residents to the appropriate lift once they arrive home. The system is outfitted with a laser guidance system to ensure safety and reliability, meaning only once the car is centered in the lift will the monitor instruct the occupant to put their car in park and close the doors. The lifts are 21 feet long, 9 feet wide, and 10 feet tall with a capacity of 8,000 pounds. Residents register their vehicles with the property so the system knows the exact location of the reserved, oversized spot, bringing the vehicle and its occupant to the appropriate floor in no more than a minute.
Apartments and condominiums both feature flexible layouts, with the condominiums residing on the top floors of the project.
Photo: David Armentor.
The Build Team includes:
Architect: Wisznia | Architecture+Development, New Orleans, LA
General Contractor: The Lemoine Company, New Orleans, LA
Glazing Contractor: Zinsel Glass, Terrytown, LA
Related Stories
Mixed-Use | Feb 7, 2017
Traditional Arab architecture and the surrounding mountainous terrain inspire a luxury hotel in Mecca
The Foster + Partners-designed building will address the shortage of accommodation in Mecca.
High-rise Construction | Jan 26, 2017
Paris tower provides office space and three hotel complexes across its three superimposed volumes
Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.
Mixed-Use | Jan 26, 2017
New renderings provide glimpse into large mixed-use project, Circa
The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018.
Mixed-Use | Jan 18, 2017
Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground
The oft-delayed project was set to begin in 2007 but was halted due to the recession.
Mixed-Use | Dec 1, 2016
Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water
The Sluishuis employs a unique shape that makes it appear different from every vantage point.
Mixed-Use | Dec 1, 2016
Initial work on mixed-use development, The Parks at Walter Reed, is underway
The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.
Multifamily Housing | Dec 1, 2016
One of Canada’s largest media companies dives into real estate development
Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.
Office Buildings | Nov 15, 2016
Under Armour unveils phase one of 50-acre Baltimore headquarters
The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.
Mixed-Use | Nov 10, 2016
Terraced mixed-use development planned for Shanghai’s urban city ring
The development will be highly accessible and provide ‘humanism’ to the area.
Mixed-Use | Nov 8, 2016
Blue Star Accelerator program seeks to help early stage businesses in the technology, sports, and entertainment industries
Applications for the program are currently being accepted.