Apple will delay the construction of a secondary, 300,000-sf research and development building on its "spaceship" campus in an attempt to drive down the cost of developing its new headquarters. In a filing with the City of Cupertino, Apple said construction of the office building on North Tantau Avenue will now commence as part of Phase 2 of its campus development, a delay that will see work begin once its iconic spaceship building has opened in 2016.
Originally scheduled for completion in 2015, Apple has been forced to push back its Campus 2 move-in date until the summer of 2016. When the campus was announced in 2011, the project already had a budget of $3 billion but that number has reportedly risen to over $5 billion as Apple moves ahead with development of what Steve Jobs said would become "the best office building in the world" — thanks to its curved glass exterior and energy-efficient design. Apple says that its development schedule "may be modified to meet [its] business needs" moving forward, so that may not be the last of its revisions. Despite these early setbacks, Apple is focused on opening its circular 2.8 million-sf building within three years, allowing it to hold more than 12,000 employees.
(http://www.theverge.com/2013/4/25/4264622/apple-delays-campus-2-office-construction)
Related Stories
| Dec 16, 2011
Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University
The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration.
| Dec 16, 2011
Stalco Construction converts Babylon, N.Y. Town Hall into history museum
The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.
| Dec 14, 2011
Tyler Junior College and Sika Sarnafil team up to save energy
Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.