Arc, an affiliate of the U.S. Green Building Council (USGBC), launched Arc Re-Entry for facility managers and companies as they work on COVID-19 re-entry plans for their buildings and spaces.
Arc is a technology platform that allows teams overseeing the sustainability of buildings and places to collect data, manage and benchmark progress, measure impact, and improve performance. Arc Re-Entry consists of tools to document and benchmark infection-control policies and procedures, collect and analyze related occupant experiences, and measure and track indoor air quality around factors such as carbon dioxide, relative humidity, and particulate matter.
Facility managers can use the new tool set to generate a performance score for their buildings that provides a comparable measure of the breadth and documentation of facility management policies, occupant experience, and measured indoor air quality. Arc Re-Entry allows facility managers to evaluate the relationship between expectations for policies and procedures, and occupants’ experience.
It also provides buildings and facilities with the tools to compare their plans against the latest guidance. In addition, it helps identify opportunities to implement LEED’s Safety First Credits and the WELL Health-Safety Rating.
Related Stories
| Aug 30, 2012
OSHA plans new crane-safety standards for demolition and underground work
The new rule will streamline OSHA’s standards by eliminating the separate cranes and derricks standard currently used for underground and demolition work.
| Aug 30, 2012
Federal government cancels defense contracts worth $2.15 billion
This action may foreshadow federal spending cuts scheduled for year's end if Congress takes no action on the federal budget.
| Aug 30, 2012
Public comment period is open for CRRC-1 standard
The CRRC-1 standard covers specimen preparation and test methods for measuring the initial and aged solar reflectance and thermal emittance of roofing products.
| Aug 30, 2012
LEED system's footprint reaches 2 billion sf, with 7 billion sf in the pipeline
About 7 billion more sf of commercial space is expected in the pipeline.
| Aug 30, 2012
Georgia drops LEED wood source standard on state projects
Currently, LEED green building standards only accept timber products certified by the Forest Stewardship Council (FSC).
| Aug 21, 2012
AGC offers second edition of the Federal Government Contractor: Ethics & Compliance Programs manual
This publication helps contractors appreciate the grounds for an alleged violation of the expected standards of business conduct and ethics, and to develop, implement, and document an effective ethics and compliance program.
| Aug 21, 2012
Federal Safe Building Code Incentive Act’s bipartisan support, no notable objection, bodes well for passage
The Safe Building Code Incentive Act would give states a little extra post-disaster federal funding if they enacted and enforced nationally recognized building codes for businesses and residences before disaster strikes.
| Aug 16, 2012
New York’s Barclays Center project accused of ignoring noise, pollution regulations
Construction crews racing to finish the Brooklyn Barclays Center are ignoring strict regulations to reduce noise and pollution, a new report by critics has found.
| Aug 16, 2012
Harness saves life of worker cleaning Washington state Capitol
Fall-protection equipment helped save the life of a worker who was cleaning the Washington state Capitol building in Olympia, after the platform he was using gave way.
| Aug 16, 2012
CSI webinar on August 21 focuses on electronic energy control
The Construction Specifications Institute (CSI) is sponsoring a free webinar on August 21 at 2:00 p.m. (EDT) on electronic energy control.