flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Codes and Standards

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.


By Peter Fabris, Contributing Editor | February 23, 2021

Courtesy Pixabay

The ASHRAE Epidemic Task Force has updated its reopening guidance for HVAC systems to help mitigate the transmission of the COVID-19 virus.

“The Building Readiness Guide includes additional information and clarifications to assist designers and commissioning providers in performing pre- or post-occupancy flush calculations to reduce the time and energy to clear spaces of contaminants between occupancy periods,” said Wade Conlan, ASHRAE Epidemic Task Force Building Readiness team lead, in a news release. “New information includes the theory behind the use of equivalent outdoor air supply, method for calculating the performance of filters and air cleaners in series, and filter droplet nuclei efficiency that help evaluate the systems’ ability to flush the building.”

There is now a link to a view-only Google Sheet that can be downloaded for use. This will help determine the available equivalent outdoor air changes and time to perform the flush. 

The guide now also includes data to consider for heating of outdoor air and the potential impact on pre-heat coils in systems.

Related Stories

| Jan 30, 2012

ZigBee and ISO 50001: Two new standards to make buildings greener

These developments demonstrate the dynamic nature of the market and the continued need for development of program standards of many different types that help builders and owners translate high performance and sustainable buildings goals into practical measures on the ground.

| Jan 30, 2012

New firm-fixed-price rules on federal contracts impact construction industry

Contractors will need to be on the lookout for policies such as the Contractor Accountability for Quality clause.

| Jan 30, 2012

Roofer’s fatal plunge demonstrates need for fall-prevention regulations

“The biggest problem is getting our workers to use the equipment,” says Michael J. Florio, executive director of the organization.

| Jan 26, 2012

Tampa moves to streamlined online permitting system

The system will replace an inefficient patchwork of old software and is designed to provide businesses, homeowners, and contractors with online access to permitting and licensing information.

| Jan 26, 2012

EPA to collect more data, seek comments before finalizing mud rule

The EPA says it will seek more data and is accepting comments until March 5.

| Jan 26, 2012

Industry challenges Connecticut's suit over defective construction work

The dispute arose over multimillion-dollar leaks at the University of Connecticut's law library.

| Jan 26, 2012

Earthquake 'fuse' could save buildings during temblors

The idea is to use an earthquake "fuse" that can prevent the tiny fractures and warps that make structures unsafe after a quake and very expensive to repair.

| Jan 26, 2012

HPD open materials standard for green building materials gains momentum

GreenWizard, provider of a cloud-based product management and project collaboration software, is the latest industry participant to sign on

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 18, 2012

Chile's seismic code upgrades credited with saving lives in 2010 quake

Since 1960, when Chile suffered a 9.5 magnitude quake, the largest ever recorded; the country has steadily improved building codes to protect lives and property.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021