In January, design firm Populous and the City of Aurora, Colo. marked the opening of the Southeast Aurora Recreation Center and Fieldhouse. The 77,000-sf facility draws design inspiration from the nearby Rocky Mountains.
With natural Douglas Fir structure and decking, the building aims to mimic the geography of a canyon. The large open entryway spans the length of the building and offers expansive mountain views through a glass curtainwall. The glass walls also provide light and visibility into various areas such as the basketball courts.
Populous designed the facility, including the city’s first indoor field house, to respect the site while also meeting the project requirements of operational efficiency, cost-effective design, and the community’s betterment.
“This new recreation center and field house stands apart as a breathtaking example of a community asset that is built to reflect, benefit, and showcase its people and its landscape,” Gudmundur Jonsson, senior architect and principal at Populous, said in a statement. “The City of Aurora now has another cost-effective and operationally efficient space that will allow it to further serve its community.”
An elevated running track extends from inside the gym out into the entryway and along the curtainwall, evoking a mountain trail. The fitness area includes a 3,000-sf patio and a garage door opening to outdoor training areas. In addition to the gym, track, and other outdoor fitness areas, the recreation center includes community spaces, volleyball courts, pickleball courts, pools, and a 20-foot-tall waterslide that runs 152 feet long.
The $41.9 million project is the second ground-up recreation center constructed for Aurora in over four decades. Populous also led the design of Aurora’s Central Recreation Center.
On the Building Team:
Owner: City of Aurora Parks, Recreation, and Open Space Department
Design architect and architect of record: Populous
MEP engineers: The Ballard Group, Innovative Electrical Systems
Structural engineer: Martin Martin
General contractor/construction manager: Saunders Construction
Related Stories
| Sep 30, 2011
Design your own floor program
Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility.
| Sep 16, 2011
Largest solar installation completed at Redskins' football stadium
On game days, solar power can provide up to 20% of FedExField’s power.
| Sep 12, 2011
First phase of plan to revitalize Florida's Hialeah Park announced
This is the first project of a master plan developed to revive the historic racetrack.
| May 25, 2011
Olympic site spurs green building movement in UK
London's environmentally friendly 2012 Olympic venues are fuelling a green building movement in Britain.
| Apr 11, 2011
Wind turbines to generate power for new UNT football stadium
The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium.
| Apr 5, 2011
U.S. sports industry leads charge in meeting environmental challenges
The U.S. sports industry generates $414 billion annually. The amount of energy being consumed is not often thought of by fans when heading to the stadium or ballpark, but these stadiums, parks, and arenas use massive quantities of energy. Now sports leagues in North America are making a play to curb the waste and score environmental gains.
| Mar 25, 2011
Qatar World Cup may feature carbon-fiber ‘clouds’
Engineers at Qatar University’s Department of Mechanical and Industrial Engineering are busy developing what they believe could act as artificial “clouds,” man-made saucer-type structures suspended over a given soccer stadium, working to shield tens of thousands of spectators from suffocating summer temperatures that regularly top 115 degrees Fahrenheit.
| Mar 11, 2011
University of Oregon scores with new $227 million basketball arena
The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC where the Ducks beat the Trojans, 68-62. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans.