flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter

BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter


By By BD+C Staff | October 24, 2011
AIA LI bestowed the award in recognition of an outstanding use of sustainable design practices during BBS work at the Nesconset

The American Institute of Architects Long Island Chapter (AIA LI) presented its prestigious 2011 Sustainable Design Award to BBS Architects & Engineers (BBS). AIA LI bestowed the award in recognition of an outstanding use of sustainable design practices during BBS’ work at the Nesconset Public Library Branch. LIPA Long Island Power Authority sponsored the Sustainable Design Award.

AIA LI also recognized BBS with the 2011 ARCHI Award Commendation for the St. Charles Resurrection Cemetery St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY.

Located in Nesconset, NY, the 25,000-sf Nesconset Library Branch project encompassed a conversion of a former federal armory structure into a library and technical services center for the entire Smithtown Special Library District. The Nesconset Library is currently undergoing the LEED certification by the US Green Building Council, with the LEED Silver level target.

BBS, a leading Greater New York area architect and designer of green institutional, educational and corporate facilities, served as architect, interior designer and engineer for the library conversion.

“We are tremendously honored to receive the 2011 Sustainable Design Award,” said BBS President and Lead Architect Roger P. Smith, AIA, LEED AP. “The Nesconset Library Branch project presented the BBS design team with an exciting opportunity to redevelop an abandoned structure into an environmentally responsible public use facility that will serve the local community for decades to come.”

The entire library building was fully renovated, including new HVAC, lighting, electrical and plumbing systems. The armory’s “drill room” was converted into a soaring open plan library space with unobstructed clerestory windows that allow natural light into the interiors. The new finishes, millwork, furniture, casework, and lighting created an inviting and fully accessible community environment for library patrons.

Headquartered in Patchogue, NY, BBS Architects & Engineers is a leading Long Island and Tri-state area designer of sustainable commercial, institutional and public facilities. The firm designed the first LEED-certified public school in New York State ­– the Hampton Bays Middle School in Hampton Bays, NY – which received LEED Silver certification, indicating a very high level of environmental sustainability in design and construction practices. BBS services include architecture and interior design as well as mechanical, electrical and plumbing engineering. 

The firm’s current and recent work includes the 100-room Hyatt Place East End hotel in Riverhead, NY; the new $28.5-million Life Sciences Building at the Suffolk County Community College Ammerman Campus in Selden, NY; the $78.2-million Riverhead Central School District expansion and capital improvement program in Riverhead, NY; the Holy Sepulchre Cemetery Administrative Building in Coram, NY; and the new Sacred Heart Roman Catholic Church in North Merrick, NY. BD+C

Related Stories

| Oct 4, 2011

GREENBUILD 2011: Wall protection line now eligible to contribute to LEED Pilot Credit 43

The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification.

| Oct 3, 2011

Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood

Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction. 

| Oct 3, 2011

Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.

| Oct 3, 2011

Cauceglia to lead Allsteel’s global accounts

Cauceglia is responsible for developing new global business strategies and expanding existing business within the Fortune 500 sector.

| Sep 30, 2011

BBS Architects & Engineers completes welcoming center at St. Charles Resurrection Cemetery

The new structure serves as the cemetery's focal architectural point and center of operations.  

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 30, 2011

AAMA offers electronic technical documents with launch of virtual library

This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publications in an effort to make AAMA’s technical information resources more readily available to their employees.

| Sep 29, 2011

Submit your Great Solutions

Profiles of Great Solutions will appear in December 2011 issue of Building Design+Construction.

| Sep 29, 2011

Busch Engineering, Science and Technology Residence Hall opens to Rutgers students

With a total development cost of $57 million, B.E.S.T. is the first on-campus residence hall constructed by Rutgers since 1994.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021