The Anaheim City School District is making significant improvements to several elementary schools in the district with the voters' passage of Proposition BB and Measure G.
BCA Architects was selected to update the district's long-range master plan, setting the stage for the future purchase of land for construction of two new elementary schools, the teardown and rebuild of two existing schools, the addition of new two-story buildings to five sites, and the full modernization of three sites over the next 20 years.
Additionally, BCA Architects was selected as Architects of Record for four of the projects to immediately begin implementation of the master plan including:
- Lincoln Elementary School Reconstruction ($25.5 million construction cost)
- Marshall Elementary School Reconstruction ($29 million construction cost)
- Edison Elementary School - Portable to Permanent replacement project; 20 classrooms, 2-story building ($10 million construction cost)
- Barton Elementary School Modernization ($6.5 million construction cost). +
Related Stories
| Oct 27, 2011
ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration
Aperio will integrate with MAXXESS's eAXxess and Efusion Event Management Software packages.
| Oct 26, 2011
Metl-Span selected for re-roof project
School remained in session during the renovation and it was important to minimize the disruption as much as possible.
| Oct 26, 2011
Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.
New store features 1,200 sf fit out at Aventura Mall.
| Oct 25, 2011
HKS Science & Technology practice formed
Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.
| Oct 25, 2011
Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions
The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.
| Oct 25, 2011
Ritner Steel CEO elected to AISC Board
Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.
| Oct 25, 2011
Commitment to green building practices pays off
The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.
| Oct 25, 2011
DOE issues report on financing solar photovoltaic systems for K-12 schools
The report examines the two primary types of ownership models used to obtain solar installations. This analysis can help school administrators across the country select the best option for deploying solar technologies in their school districts.