flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Behnisch Architekten designs Harvard’s proposed Science and Engineering Complex

University Buildings

Behnisch Architekten designs Harvard’s proposed Science and Engineering Complex

The 497,000-sf building will be the home of the John A. Paulson School of Engineering and Applied Sciences.


By BD+C Staff | March 15, 2016
Behnisch Architekten designs Harvard’s proposed Science and Engineering Complex

The proposed Science and Engineering Complex, located on Harvard University’s Allston campus, integrates one of the country’s most diverse and exciting engineering programs into a 497,000-sf structure. Renderings courtesy Harvard/Behnisch Architekten. Click here for larger image

Behnisch Architekten designed the Science and Engineering Complex, a new facility for Harvard University's Allston campus in Boston. It will be the home of the John A. Paulson School of Engineering and Applied Sciences (SEAS).

The 497,000-sf building will have a series of research boxes situated above a two-story transparent plinth. Classrooms and teaching labs will be in the plinth’s lowest floors, and isolated research labs will be in its highest floors. Fabrication shops, core research facilities, and a loading dock will be placed in below-grade levels. All levels are connected by a central atrium, which receives daylight from an attached courtyard.

Glass ribbons will wrap around the complex’s lowest levels. The upper boxes will be covered in a screen enclosure that both shields the building from solar heat gain during warmer months and reflects daylight into the interior.

The massing of the building will form a courtyard, which students and staff can use for outdoor recreation and other events.

The school expects 1,600 students and 360 staff members to use the building daily, and it anticipates the building to be open by 2020. Construction will begin this year.

 

(Click photos to enlarge)

The central atrium and the major entries have multi-story all-glass façades that are shaded by integrated roof planes at varying heights.

The massing of the building forms a new landscaped courtyard space suitable for outdoor recreation and events towards the site’s center.

As the primary home of the John A. Paulson School of Engineering and Applied Sciences (SEAS), the complex will create public spaces at different scales throughout the building.

The new facility emphasises outdoor space, street activation, and integration with larger public space networks.

Related Stories

University Buildings | Apr 2, 2019

Denning House completes at Stanford University

Ennead Architects designed the building.

University Buildings | Mar 27, 2019

Veterans Resource Center at Cypress College breaks ground

Sundt Construction is building the project.

Mixed-Use | Feb 21, 2019

An R&D-oriented innovation district is taking shape in the heart of Durham, N.C.

Its buildout has included converting old tobacco warehouses into offices and labs.

University Buildings | Jan 29, 2019

The Colorado School of Mines CoorsTek Center opens

Bohlin Cywinski Jackson designed the building.

University Buildings | Dec 17, 2018

SCUP and University of Pennsylvania School of Nursing release study results on lactation policy and facilities in U.S. higher education

There is a wide variability between how campuses accommodate the needs of breastfeeding mothers.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021