flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Behnisch Architekten designs Harvard’s proposed Science and Engineering Complex

University Buildings

Behnisch Architekten designs Harvard’s proposed Science and Engineering Complex

The 497,000-sf building will be the home of the John A. Paulson School of Engineering and Applied Sciences.


By BD+C Staff | March 15, 2016
Behnisch Architekten designs Harvard’s proposed Science and Engineering Complex

The proposed Science and Engineering Complex, located on Harvard University’s Allston campus, integrates one of the country’s most diverse and exciting engineering programs into a 497,000-sf structure. Renderings courtesy Harvard/Behnisch Architekten. Click here for larger image

Behnisch Architekten designed the Science and Engineering Complex, a new facility for Harvard University's Allston campus in Boston. It will be the home of the John A. Paulson School of Engineering and Applied Sciences (SEAS).

The 497,000-sf building will have a series of research boxes situated above a two-story transparent plinth. Classrooms and teaching labs will be in the plinth’s lowest floors, and isolated research labs will be in its highest floors. Fabrication shops, core research facilities, and a loading dock will be placed in below-grade levels. All levels are connected by a central atrium, which receives daylight from an attached courtyard.

Glass ribbons will wrap around the complex’s lowest levels. The upper boxes will be covered in a screen enclosure that both shields the building from solar heat gain during warmer months and reflects daylight into the interior.

The massing of the building will form a courtyard, which students and staff can use for outdoor recreation and other events.

The school expects 1,600 students and 360 staff members to use the building daily, and it anticipates the building to be open by 2020. Construction will begin this year.

 

(Click photos to enlarge)

The central atrium and the major entries have multi-story all-glass façades that are shaded by integrated roof planes at varying heights.

The massing of the building forms a new landscaped courtyard space suitable for outdoor recreation and events towards the site’s center.

As the primary home of the John A. Paulson School of Engineering and Applied Sciences (SEAS), the complex will create public spaces at different scales throughout the building.

The new facility emphasises outdoor space, street activation, and integration with larger public space networks.

Related Stories

University Buildings | Dec 10, 2018

Suffolk breaks ground on large housing/dining complex for UMass Dartmouth

This is the first phase of a large construction/renovation plan for the school’s main campus.

University Buildings | Nov 26, 2018

Vacant Dartmouth College building to become faculty and graduate student center

Leers Weinzapfel Associates designed the project.

Mixed-Use | Oct 25, 2018

Philadelphia’s uCity Square kicks off major expansion drive

This innovation center has several office, lab, and residential buildings in the works.

University Buildings | Oct 23, 2018

A building designed by architects, for architects

Kansas State University’s new College of Architecture Planning and Design places students at the center of the experience.

University Buildings | Oct 8, 2018

One size doesn't fit all: Student housing is not a pair of socks

While the programming and design for these buildings all kept a holistic living/learning experience at the core, they also had amazingly different outcomes.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021