flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BEST AEC FIRM 2011: Chapman Construction/Design

BEST AEC FIRM 2011: Chapman Construction/Design

Taking sustainable practices to heart.


By By Robert Cassidy | December 9, 2011
Best AEC Firms 2011 Chapman Construction/Design
Chapman Construction/Design professionals on the job. Commercial interiors make up 80% of its work. Nearly half the firms staff
This article first appeared in the December 2011 issue of BD+C.

Based in Newton, Mass., Chapman Construction/Design is a 54-person firm specializing in sustainable construction management and consulting services for corporate, education, and medical/biotech clients.

Founded in 1984, Chapman provides its employees with quarterly industry-specific training seminars on building science, new methods and materials, and LEED accreditation preparation. Nearly half of all employees—26 of 54—have earned LEED AP status.

As further evidence of its commitment to sustainability, the firm completed a LEED-CI Platinum renovation of its 12,000-sf headquarters office. The project has been recognized as the first Massachusetts Department of Energy Resources case study for a near-net-zero commercial building.

BEST AEC FIRMS TO WORK FOR 2011 WINNERS
Chapman Construction/Design
EYP Architecture & Engineering
Gensler
HMC Architects
MHTN Architects

With 80% its work in commercial interiors, Chapman has provided pro bono new construction and building improvements for numerous local nonprofits and community organizations: Project Hope, the Learning Center for Deaf Children, Dimock Community Health Center, the Home for Little Wanderers, and Rosie’s Place, a women’s shelter.

Look for a more extensive report on Chapman Design/Construction in an upcoming issue of BD+C.

Related Stories

| Sep 22, 2010

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

| Sep 22, 2010

Satellier, Potential + Semac close investment deal

Satellier, a world leader in providing CAD and Building Information Modeling (BIM) outsourced services to the architecture, engineering and construction industry, announces a strategic minority investment from India-based top engineering firm Potential + Semac, ushering in the next evolution of the global architecture support industry.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Sep 21, 2010

Forecast: Existing buildings to earn 50% of green building certifications

A new report from Pike Research forecasts that by 2020, nearly half the green building certifications will be for existing buildings—accounting for 25 billion sf. The study, “Green Building Certification Programs,” analyzed current market and regulatory conditions related to green building certification programs, and found that green building remain robust during the recession and that certifications for existing buildings are an increasing area of focus.

| Sep 21, 2010

Middough Inc. Celebrates its 60th Anniversary

Middough Inc., a top ranking U.S. architectural, engineering and management services company, announces the celebration of its 60th anniversary, says President and CEO, Ronald R. Ledin, PE.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021