flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Biden’s Clean Air in Buildings Challenge aims to reduce COVID-⁠19 spread

Regulations

Biden’s Clean Air in Buildings Challenge aims to reduce COVID-⁠19 spread

Call to action for owners to assess indoor air quality and make ventilation and air filtration improvements.


By Peter Fabris, Contributing Editor | May 20, 2022
Clean AIr In Buildings
Courtesy Pixabay.

The Biden Administration recently launched the Clean Air in Buildings Challenge that calls on all building owners and operators, schools, colleges and universities, and organizations to adopt strategies to improve indoor air quality in their buildings and reduce the spread of COVID-19.

In conjunction with that announcement, the Environmental Protection Agency (EPA) published a best practices guide for improving indoor air quality and reducing the risk of spreading dangerous airborne particles. The guide, developed in collaboration with the Department of Energy, Centers for Disease Control and Prevention, and other federal agencies, contains a set of recommendations organized into four groups:

  • Create a clean indoor air action plan that assesses indoor air quality, plans for upgrades and improvements, and includes HVAC inspections and maintenance.
  • Optimize fresh air ventilation by bringing in and circulating clean outdoor air indoors.
  • Enhance air filtration and cleaning using the central HVAC system and in-room air cleaning devices.
  • Engage the building community by communicating with building occupants to increase awareness, commitment, and participation.

Under these recommendation areas, EPA’s best practices guide lays out actions building owners and operators can implement. The guide offer a menu of improvements and includes quick steps that organizations can take right away as well as resources to help plan for longer-term investments and improvements.

Related Stories

Codes and Standards | Feb 6, 2015

Obama executive order requires federal construction projects to consider flood damage caused by climate change

To meet the new standard, builders must build two feet above the currently projected elevation for 100-year floods for most projects.

HVAC | Feb 6, 2015

ASHRAE, REHVA publish guide to chilled beam systems

The guide provides tools and advice for designing, commissioning, and operating chilled-beam systems.

Codes and Standards | Feb 2, 2015

AGC working with EPA on website to help with environmental rule compliance

The goal is for the site to be improved to make it easier for construction contractors to learn how to comply with federal and state environmental guidelines.

| Jan 9, 2015

New OSHA regulations on reporting workplace deaths, hospitalizations take effect

As of Jan. 1, all employers under the jurisdiction of OSHA are required to report all work-related fatalities within eight hours and all in-patient hospitalizations, amputations, and losses of an eye within 24 hours.

| Jan 9, 2015

Zoning policy makes Bethesda, Md., a model walkable suburb

In sharp contrast to most suburban communities in the Washington, D.C. area, Bethesda, Md., stands out as a fine exemplar of the new urbanism ethos.

| Jan 2, 2015

Ohio’s Licking County to hire construction stormwater runoff specialist

Formed to focus on agriculture, the Licking County (Ohio) Water and Soil Conservation District has branched out to oversee construction sites.

| Dec 23, 2014

EPA okays coal ash recycling in construction materials

The Environmental Protection Agency ruled that the use of coal ash produced in power plants can continue to be incorporated into construction materials.

| Dec 18, 2014

New federal regulations impact construction firms doing business with Uncle Sam

Federal contractors may be subject to several new rules in 2015 that impact how they are selected for contracts and how they do business with the federal government.

| Dec 18, 2014

Boston testing mobile building permit tracking app

The app called Permit Finder could free city employees from having to respond to the 30 to 40 permit status-related calls they receive each week. 

| Dec 11, 2014

Los Angeles mayor proposes earthquake retrofit program

The ambitious program would focus on some apartment buildings built before 1978 and concrete buildings constructed before 1976.

boombox1
boombox2
native1

More In Category

Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021