As BIM continues to exert its explosive impact on the AEC industry, one component that has been comparatively quiet is academia, specifically the world of architectural education. BIM in Academia looks to reevaluate BIM’s place in the architectural education world—the Academy, as it is referred to in the book. The book, edited by Peggy Deamer, AIA, and Phillip G. Bernstein, FAIA, both of whom teach at the Yale School of Architecture (Bernstein is also a vice president at Autodesk, maker of the Revit BIM platform), examines the questions raised by having BIM in an academic setting and provides BIM case studies from faculty at a number of U.S. architecture schools. Although unabashedly written by academics for academia, the book has several noteworthy themes that cross over between the AEC industry and the Academy.
ARCHITECTURE STUDENTS, VDC, AND THE AEC INDUSTRY
One of these has to do with why VDC-enabled construction firms are seeking out the graduates of architecture schools. The fact is that a number of construction companies (including Gilbane, where I work) are hiring architecture graduates because the curricula and highly demanding class loads of these programs make their graduates ideal candidates for VDC projects. As a VDC manager myself, I have found that architecture graduates often make fantastic VDC professionals. They also find this role highly fulfilling. Asked why he liked doing VDC at a construction firm, a recent MArch graduate replied, “One of the most rewarding aspects of the VDC industry is our influence on how designers and builders interact.” This is exactly the sort of answer one would hope for from the people who are best suited for BIM’s collaborative environment.
The supply of talented VDC candidates still does not meet the demand—a gap that will only widen as the industry recovers and project loads increase. That’s why AEC industry professionals who focus on advanced VDC implementation are eagerly watching developments related to the Academy’s evolving relationship with BIM.
Furthermore, with the unemployment rate for new architectural graduates at nearly 15%, and with professional internships at design firms few and far between, there is a dire need for architecture students to make themselves as marketable as possible. Employers—design and construction firms alike—are looking for new hires to be highly functional in extremely short periods of time. These demands put tremendous pressure on new architecture graduates.
Fluency in BIM can be a critical differentiator for a new graduate. If the Academy truly wishes to see its recent graduates thrive in the AEC industry, making BIM an integral part of the curriculum is imperative. This also creates an opportunity for the profession (both design and construction) to positively engage with Academia to provide lessons learned, technical expertise, and best practices in BIM and VDC.
If there is a single valuable takeaway from BIM in Academia, it is that the Academy is moving beyond “Should we be involved in BIM?” to clearly addressing more functional concerns around “How do we integrate BIM into the curriculum?” The institutions that are producing the next generation of architects and VDC professionals are in the beginning stages of a curriculum revolution that can have the long-term impact akin to that of Walter Gropius’s Bauhaus School.
This shifting attitude in many ways mirrors how the industry and individual firms adopt BIM. It usually starts out as a process where the firm attempts to understand the ramifications of BIM, what resources BIM implementation requires, and how BIM fits into their particular business model. As the firm begins using the tool on projects, the question becomes “How do we improve or reinvent what we’re doing?”
The recent BIMForum meeting that focused on VDC deliverables across the AECO market also concluded that, as an industry, we’re beyond “Should we?” and are now entering a period of rapid growth centered on how to implement BIM most effectively.
The contributors to BIM in Academia and AEC industry professionals agree on one thing: Change is here, and more change is coming. “BIM threatens all hierarchies,” the book states, and this holds true for both academic and professional settings. After a firm pushes seriously into VDC, nothing is untouched. From the early design phase in an architectural firm, to building turnover at a construction management firm, standard business practice changes when integrating BIM. Such change isn’t always comfortable, easy, or smooth, as the numerous case studies in the book (and in real practice) demonstrate.
Many practicing designers fear that BIM is a homogenizing tool that inflicts a limited set of parametric tools on the project, takes the designer out of the driver’s seat, and replaces the professional with a set of soulless mathematical constraints. This is a common topic of discussion, both in the Academy and in design firms.
The above statement is true to some extent, but only insofar that it is true that a mechanical pencil—an earlier “soulless tool”—can manipulate the design process. Such is the case only if the person operating the pencil isn’t capable of using it effectively. The same argument applies to BIM software.
Fluency with the best tools for the job is critical, but lack of operator capability should not be confused with perceived deficiencies of the software. Look no further than the AIA-award-winning work of the parametric wizards at CASE Design in New York City to appreciate how BIM tools can allow the realization of pure design. These BIM tools are so flexible that they are used for modeling the sets of blockbuster movies the likes of “The Fantastic Four” and “The Watchmen.”
WILL THE REAL MASTER BUILDER PLEASE STAND UP?
One question that the book touches on, and which often comes up in industry discussions of BIM and IPD, is “Who is the master builder, and how does BIM fit into that role?” With the advent of BIM, the master builder is now is the whole team. At last December’s AIA Student Chapter National Forum, two Gilbane VDC engineers presented a discussion of how the role of the master builder has evolved and where they see it headed. What is interesting about these two VDC professionals is that they are both IDP-logging, card-carrying Associate AIA architecture interns. Although their professional affiliation is obviously not an objective source, they argued that BIM and VDC tools are pulling the “master builder team” together in a cohesive way after a more than 40-year period of separation. An important component of this trend is the advent of highly collaborative project delivery methods like Construction Management at Risk with Design Assist and various types of IPD contracts that are critical to making the team-based master builder concept work.
THE ONGOING SEARCH FOR THE RIGHT PEOPLE
In his essay, John I. Messner, PhD, an associate professor of architectural engineering at Penn State, wrote that the AEC industry needs more “T-shaped people” on such composite BIM/VDC teams. T-shaped people have a broad field of knowledge across disciplines, with great depth of expertise in a single field. Finding such T-shaped team members is a critical step for any AEC company looking to start, expand, or assemble a VDC-enabled organization. Implementing such a strategy will create the best building project teams.
BIM in Academia suggests several possible routes—much like those AEC firms are taking—for the Academy to accelerate the development and integration of BIM/VDC into their programs. The industry-leading BIM/VDC firms are already starting to push BIM tools into the hands of field and office staff alike, as well as assigning traditional project roles like assistant project manager or project engineer to VDC staff members.
From my reading of BIM in Academia, it is clear that the front-running academic institutions are not far behind professional practice in BIM thinking: the sooner they catch up, the better the AEC industry will be for it. AEC industry professionals with BIM/VDC experience have a responsibility to provide feedback, assistance, and resources to make sure that our most critical supplier, the Academy, continues to provide the human capital necessary to sustain the integration of VDC into the design and construction industry. BD+C
--
John Tocci, Jr., is Manager of Virtual Design and Construction at Gilbane Building Company and a BD+C “40 under 40” honoree.
Related Stories
| Mar 16, 2011
AIA offers assistance to Japan's Architects, U.S. agencies coordinating disaster relief
“Our hearts go out to the people of Japan as a result of this horrific earthquake and tsunami,” said Clark Manus, FAIA, 2011 President of the AIA. “We are in contact with our colleagues at AIA Japan and the Japan Institute of Architects to offer not only our condolences but our profession's technical and professional expertise when the initiative begins focusing on rebuilding."
| Mar 16, 2011
Are you working on a fantastic residence hall project? Want to tell us about it?
The feature story for the May 2011 issue of Building Design+Construction will focus on new trends in university residence hall design and construction, and we’re looking for great projects to report on and experts to interview. Projects can involve new construction or remodeling/reconstruction work, and can be recently completed, currently under construction, or still on the boards.
| Mar 16, 2011
Foster + Partners to design carbon-neutral urban park for West Kowloon Cultural District in Hong Kong
Foster + Partners has been selected by the board of the West Kowloon Cultural District Authority to design a massive 56-acre urban park on a reclaimed harbor-front site in Hong Kong. Designed as a carbon-neutral development, “City Park” will seamlessly blend into existing streets while creating large expanses of green space and seventeen new cultural venues.
| Mar 15, 2011
What Starbucks taught us about redesigning college campuses
Equating education with a cup of coffee might seem like a stretch, but your choice of college, much like your choice of coffee, says something about the ability of a brand to transform your day. When Perkins + Will was offered the chance to help re-think the learning spaces of Miami Dade College, we started by thinking about how our choice of morning coffee has changed over the years, and how we could apply those lessons to education.
| Mar 15, 2011
What will the architecture profession look like in 2025?
The global economy and the economic recession have greatly affected architecture firms' business practices. A Building Futures survey from the Royal Institute of British Architects looks at how these factors will have transformed the profession and offers a glimpse of future trends. Among the survey's suggestions: not only will architecture firms have to focus on a financial and business approach rather than predominantly design-led offices, but also company names are predicted to drop ‘architect’ altogether.
| Mar 15, 2011
Passive Strategies for Building Healthy Schools, An AIA/CES Discovery Course
With the downturn in the economy and the crash in residential property values, school districts across the country that depend primarily on property tax revenue are struggling to make ends meet, while fulfilling the demand for classrooms and other facilities.
| Mar 14, 2011
Renowned sustainable architect Charles D. Knight to lead Cannon Design’s Phoenix office
Cannon Design is pleased to announce that Charles D. Knight, AIA, CID, LEED AP, has joined the firm as principal. Knight will serve as the leader of the Phoenix office with a focus on advancing the firm’s healthcare practice. Knight brings over 25 years of experience and is an internationally recognized architect who has won numerous awards for his unique contributions to the sustainable and humanistic design of healthcare facilities.
| Mar 11, 2011
University of Oregon scores with new $227 million basketball arena
The University of Oregon’s Matthew Knight Arena opened January 13 with a men’s basketball game against USC where the Ducks beat the Trojans, 68-62. The $227 million arena, which replaces the school’s 84-year-old McArthur Court, has a seating bowl pitched at 36 degrees to replicate the close-to-the-action feel of the smaller arena it replaced, although this new one accommodates 12,364 fans.
| Mar 11, 2011
Temporary modular building at Harvard targets sustainability
Anderson Anderson Architecture of San Francisco designed the Harvard Yard childcare facility, a modular building manufactured by Triumph Modular of Littleton, Mass., that was installed at Harvard University. The 5,700-sf facility will remain on the university’s Cambridge, Mass., campus for 18 months while the Harvard Yard Child Care Center and the Oxford Street Daycare Coop are being renovated.
| Mar 11, 2011
Holiday Inn reworked for Downtown Disney Resort
The Orlando, Fla., office of VOA Associates completed a comprehensive interior and exterior renovation of the 14-story Holiday Inn in the Downtown Disney Resort in Lake Buena Vista, Fla. The $25 million project involved rehabbing the hotel’s 332 guest rooms, atrium, swimming pool, restaurant, fitness center, and administrative spaces.