flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boards at odds over North Carolina county’s CM-at-Risk policy

Boards at odds over North Carolina county’s CM-at-Risk policy

Wake County school officials favor CM-at-Risk, while commissioners are wary


August 14, 2014

The Wake County, North Carolina School Board is happy with its use of construction manager at risk for its construction projects, citing the ability to better keep projects on schedule. Some local small contractors are not pleased, though, with the board’s CM-at-Risk policy that was instituted in 2007. The county’s board of commissioners has offered a sympathetic ear to their complaints.

The key point of dispute is that under this delivery method, the construction manager prequalifies the subcontractors who can bid on the work. Some feel that as a result of this provision they are shut out of the process for work that was previously open to them.

These complaints helped lead to the passage of a state law last year requiring public entities to justify using CM-at-Risk for each project. Under this law, school staff will come back to the school board to request approval for using CM-at-Risk for most of the major projects funded by last fall’s bond issue.

At odds over this issue, the two boards have yet to reach consensus on how CM-at-Risk should be used on future school projects.

(http://www.newsobserver.com/2014/08/11/4059339/wake-county-schools-defend-use.html)

             

Related Stories

| Jul 31, 2014

Gypsum Association releases updates to wallboard repair standards

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications.

| Jul 31, 2014

Cambridge, Mass., is latest locale to require energy usage disclosure

The City Council of Cambridge, Mass., approved the Building Energy Usage and Disclosure Ordinance (BEUDO) that requires benchmarking and disclosure of building energy performance for large commercial, institutional, and multifamily buildings.

| Jul 31, 2014

Stalled $1.5 billion Miami mixed-use redevelopment project advances

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase.

| Jul 30, 2014

USGS updates National Seismic Hazard Maps

The U.S. Geological Service recently released an update of U.S. National Seismic Hazard Maps that reflect the latest analysis of where future earthquakes will occur, how frequently they may occur, and their strength.

| Jul 23, 2014

Fairfax County, Virginia toughens green standards

The Fairfax County Board of Supervisors recently strengthened its green building policy, requiring higher standards for residential, retail, office and other construction projects seeking approval for rezoning.

| Jul 23, 2014

Berkeley National Lab’s FLEXLAB is a test bed for energy efficient office design

FLEXLAB, short for the Facility for Low Energy Experiments, opened this summer at the Lawrence Berkeley National Laboratory.

| Jul 23, 2014

House passes 2015 GSA budget with 17% cut for new construction projects

The General Services Administration’s construction budget for fiscal year 2015 passed by the House this month includes cuts in both new construction and renovation/repairs compared to 2014.

| Jul 16, 2014

Coastal flooding increasing along East Coast, says report

An analysis of tidal levels and flood data by the news organization Reuters concludes that flooding has increased along the Eastern Seaboard over the past four decades.

| Jul 16, 2014

Local hiring requirement a tough challenge for new Detroit arena project

An agreement for a land transfer from the City of Detroit to Ilitch Holdings Inc., that enabled construction of a new arena for the Detroit Red Wings requires that 51% of the project’s construction workers must come from the city.

| Jul 16, 2014

Local hiring requirement a tough challenge for new Detroit arena project

An agreement for a land transfer from the City of Detroit to Ilitch Holdings Inc., that enabled construction of a new arena for the Detroit Red Wings requires that 51% of the project’s construction workers must come from the city.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021